Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 52 of 775

Enable remote connection to Studio

[Problem Summary] If all the ports are blocked except for the ones mentioned in the installation guide, the ability to connect to a PM server remotely via studio no longer works (it works fine if all ports are unblocked) [Possible Cause] Unsupport...
Nina NICHOLLS 4 months ago in Production Management (AMPLA MES) / Configuration 0 Needs review

Search in Catalogue

Motivation Request from Technip: As the number of Class Libraries (or fragments) stored in the catalogue is growing, finding a given Class Library becomes harder. Proposed solution Provide a quick search in catalogue, searching in Class Library @i...
Geoffrey Coad almost 4 years ago in Information Standards Manager 0

Ability to bulk configure (Relationship Matrix, Heirarchy)

https://schneiderampla.atlassian.net/browse/CE-1892 https://schneiderampla.atlassian.net/browse/CE-1997 https://schneiderampla.atlassian.net/browse/CE-1913 [Raised by]Customer Company: Rio Tinto Iron OreCustomer Contact: Ben Jones [Enhancement Req...
Nina NICHOLLS about 6 years ago in Production Management (AMPLA MES) / Configuration 0 Future consideration

Support extensions in ISM with > 1024 characters

Can we add an item onto the backlog to support extensions in ISM with > 1024 characters. Since we are using ISM for recording certain configuration, an example situation is a JSON template which may easily be larger than this, which will make a...
Andy Davidson almost 4 years ago in Information Standards Manager 0

Expose timeout setting for P2B integration

[Problem Summary] Customer uses a stored proc in the P2B SelectCommand property to fetch the PI event frames from PI Server. It is normal for the query to run for 2 minutes or longer sometimes. When in this situation, Ampla integration reports tim...
Nina NICHOLLS over 2 years ago in Production Management (AMPLA MES) / Configuration 0 Future consideration

Tag Labels

From Jon Tomkins. Following up on an old enhancement request from the Aussies on ISM. It may not be seen as high priority but wanted to flag a pain point for implementation – when we are attempting configuration management of compositions, as toda...
Andy Davidson almost 3 years ago in Information Standards Manager 0

Required Version label is confusing

From Jon Tonkins: If a version is set to something like 1.0.2.*, understand this actually means ‘use latest version’. This reads confusingly as it looks like it should only be 1.0.2.something but can then be 1.0.3, etc.
Andy Davidson almost 3 years ago in Information Standards Manager 0

Evaluated fields for Material movement items

Material movement items currently do not support evaluated fields. As a part of the Alcoa project, at a certain point in their design, which uses meter marks to capture movements, having evaluated fields on movements would have helped to work out ...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Configuration / Inventory 0 Future consideration

Naming/numbering counter for class ID

The id for any id in ISM should be automatically generated based on naming rules.
Andy Davidson about 3 years ago in Information Standards Manager 0 Planned

Metrics copy/paste

If you copy/ paste a Metrics reporting point, a KPI with resolver hooked to a KPI in the same reporting point should be updated to look at the new reporting point not the original one as it is currently.
Mehrnoosh KHODAVERDY almost 7 years ago in Production Management (AMPLA MES) / Configuration / Metrics 0 Future consideration