Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Equipment Isolations

Showing 30

OSM Improvement proposal - AT: Indication of insulation list type

Alvheim wants to be able to see at WP what types the associated ILs are. Can, for example, be solved by getting dedicated fields for MIL and EIL/HT. Or a prefix on the IL number that shows the type of MIL/EIL.
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement proposal - Signing of insulation lists / insulation points

"Suggestions that can make things a little easier when we have to sign for the isolation of points in IL. Per dd. you can either sign/verify one point at a time or sign for everyone in one print. If there are several of us who are isolating over s...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Evaluating

OSM Improvement Proposal - Be able to duplicate lists in COW and link lists to other isolation plans

We would like to have the ability to duplicate lists against a new insulation plan. It is often possible to use lists from another isolation plan against the created plan, but there is no possibility to duplicate lists into a new plan. If you want...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 0 Evaluating

OSM Improvement proposal - P&IDs that are added to IL cannot be deleted (if one has been added incorrectly)

"P&IDs that are added to the IL cannot be deleted (if one has added the wrong P&ID, for example) Prepared IL for mechanical list. Attach the wrong P&ID. Can't get the P&ID deleted again. Nor can it be deleted if we reset the status...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 0 Evaluating

OSM Improvement Proposal - Not possible to remove points in an isolation list during modification

"User requested priority of P3 Medium There was a need to move the barriers in an isolation that had been set and activated. In COW there are a number of interlocks which, among other things, mean that it is not allowed to remove points on an isol...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 0 No status

OSM Improvement Proposal - Being able to link freely chosen ILs into an IP without having to create them from the IP

We would like to be able to link IL lists into IP afterwards without having to create IL from the IP. When I am going to reuse IL lists today, I have to copy a complete IP. I would like to take a list from one IP and another list from another IP. ...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement Proposal - Could indicate that tag is referenced on other open IP/IL

Found on Aveva's backlog but should also be recorded from Aker BP
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement proposal - Isolated safety equipment and compensatory measures

"Description: Be able to inherit this on the IL and override. Requirements. If it is set up on the IP that safety equipment is isolated, at least 1 IL must be unhooked. If it is set up on the IP that safety equipment is NOT isolated, no IL can be ...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement proposal - IL number on all pages of the printed insulation list

When insulation lists are printed, they come across several pages. Then it can quickly become a mess about which insulation points belong to which insulation list. Will have the IL number at the top of all pages of the insulation list when it is p...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 0 No status

OSM Improvement proposal - IL recommenation to AT based on the IP linked to the AO on which the AT is based

Have linked the wrong IL to WP several times, it happened last today that it was unnecessary to have to run things through the approval process for Level 1 again, so when we are going to link IL to WP it would have been fine to have a ready defaul...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists