Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

Status Submitted
Portfolio area Advisory Group Ideas
Products Process Design
Created by Hiromi Yorke
Created on Aug 30, 2021

[Onbehalf of Mr Makino from ENEOS Corporation] Avoidance to display as Pseudo stream when there is single outlet stream from Drum

As a flash drum is set to dew point and F2 port is connected, the stream is coloured as a pseudo stream with ver. 2020. Experienced users remember a stream from F2 port can be mixed phases when duty=0 is set, for instance. But for dew point calculation, it is actually defined for liquid.


This can be confusing, so the following enhancement is requested:

1. If only one product stream is connected to flash unit, it should not be considered as pseudo stream and should be displayed as normal stream.

2. When 2nd stream is connected, then based on flash specifications corresponding stream display will change to pseudo stream or normal stream. When multiple streams are connected, then ‘product phases’ option is also activated for user entry/reconfirmation.

Idea industry O&G, Gas Processing, Refining, Petrochemicals
Idea target user Process Design Engineer
Idea priority 4 – Important to my company
Idea business value

There are currently 200 users in the corporation. One person can spend on this confusion for 30 min a year, which makes approximately 100 hours of time loss. In addition, about 30 users increase every year and the impact gets bigger as this feature is left.

  • Attach files