Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 5 of 776

Invalid Timestamp Handling in IEC 60870-5-104 Driver within AVEVA Telemetry Server

In an energy remote control system, we are using the AVEVA Telemetry Server to read/write data from PLCs via the IEC 60870-5-104 protocol. During analysis of the communication frames, we have observed that, in some cases, values are received with ...
Jordi Román 3 months ago in Application Server / Device Integration / Other 0

Object Viewer: Provide the ability to copy data from the Watch List pane to the Windows clipboard

Logged as an enhancement as IMS 3871483. I want to be able to copy the contents of a watch list to the Windows clipboard, so that I can paste it into Notepad, Excel, etc. In other words, I want Object Viewer (watch list pane) to support the same f...
John Knox-Davies 9 months ago in Application Server / Other 0

Tollerance factor value change in case the flow meter measured value is out of pre-defined range

Flow meter's accuracy changes when measure value is out of range. Hence, there should be a mechanism to support this feature with-in the application. This can be enabled with logical conditional statements for tolerance value settings. Instead of ...
Kiran Karumuri over 2 years ago in Production Accounting / New features request 0 Planned

Valve equation generation with-in the application as utility

Flow estimation valve equation being generated outside the application and same being configured with-in the application during project implementation stage. Utility with-in the application will not only enables the services and also the customer ...
Kiran Karumuri over 2 years ago in Production Accounting / General 0 Planned

Node Balance report generation with-in APA

Many customers looks at node wise balance report to track the imbalances at micro level to check, review and validate. Manual report configuration and preparation is cumbersome and time taking. Auto generation of node wise report with-in the appli...
Kiran Karumuri over 2 years ago in Production Accounting / Reports 0 Planned