Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Production Management (AMPLA MES)

Showing 148

Allow filtering Inventory Error Messages

There is a requirement from BHP to be able to find specific types of error. Unfortunately currently the ErrorMessage field cannot be set to be filterable
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) 0 Future consideration

First Classififer field

Rio Tinto currently populates a custom field called 'First Classifier' that is populated when an operator enters cause,classification. Currently, this is achieved via action/code items dependent on RCEs generated by downtime reporting points. Rio ...
Nina NICHOLLS over 2 years ago in Production Management (AMPLA MES) 2 Will not implement

Ability to clear Cause,Classification and Effect all at once in PA

[Enhancement Request]Currently, if an Operator wants to simply reset (not change to another value) Effect/Cause/Classification they would right-click on the field and select 'Reset'. If they wanted to reset the Relationship Matrix for a Downtime R...
Nina NICHOLLS about 5 years ago in Production Management (AMPLA MES) / Client 0 Future consideration

Ability to bulk configure (Relationship Matrix, Heirarchy)

https://schneiderampla.atlassian.net/browse/CE-1892 https://schneiderampla.atlassian.net/browse/CE-1997 https://schneiderampla.atlassian.net/browse/CE-1913 [Raised by]Customer Company: Rio Tinto Iron OreCustomer Contact: Ben Jones [Enhancement Req...
Nina NICHOLLS about 5 years ago in Production Management (AMPLA MES) / Configuration 0 Future consideration

Partial Import/Export

To allow engineers to configure different parts of an Ampla project and merge them safely.It is only a solution to allow multiple people work on the same solution. However if you could provide a multi engineering environment, this feature is not r...
Mehrnoosh KHODAVERDY over 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Add business rules to movement and quality events

BHP requirements to highlight records that don't meet some business and validation rules
Mehrnoosh KHODAVERDY about 4 years ago in Production Management (AMPLA MES) 0 Planned

KPI targets based on calendar loopkup should look at target for each sub period

[Problem Summary]Merhnoosh have found an issue with calendar items used as a target for Metrics KPIs. When you have a calendar item bound to a period (ie daily target), and is used as a target for a metrics KPI, Ampla doesn’t calculate the correct...
Nina NICHOLLS over 4 years ago in Production Management (AMPLA MES) 0 Planned

Ampla to support Industry 4.0

[Problem Summary] Customer is building a Data Production Model based on Industry 4.0 and is planning to obtain AMPLA data via Industry 4.0 method to the production model data warehouse. The vision for the customer is to move away from the custom s...
Nina NICHOLLS over 1 year ago in Production Management (AMPLA MES) 0 Already exists

Mechanism for clearing cause location filter when switching navigation mode to location

[Problem Summary]Downtime reporting point navigation allows user to choose either Location or Cause location to view downtime records. However, when switch from location to cause location, the filter is automatically populated current Location sel...
Nina NICHOLLS about 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration