Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 41

Define DCS Readback and DCS Status

When defining these tags in a controller, allow them to be selected from a list of all Input Tags, with possibility to apply a filter to limit the size of the presented list. Currently we have to enter the text directly with all kinds of possibili...
Geoff Lewis over 1 year ago in APC / Controller Configuration 0 Evaluating

Convert Raw Tag to Custom

Currently it is possible to convert a Custom Tag to Raw Tag, but not vice versa. This would be v helpful when migrating controllers.
Geoff Lewis over 1 year ago in APC / General 0 Evaluating

Temporarily add / overlay tags that are not included in a model, when analysing model OMR

This is a direct request from an end-user. Sometimes there are tags outside of a model that will provide useful context to the analyst in reviewing an anomaly within Web Monitoring Client. At the moment this requires the user to separately a...
Guest over 3 years ago in Predictive Analytics / Web Monitoring Client 0 Evaluating

Filtering stats based on conditions

When comparing control performance with and without APC, it would be helpful to see separately the average, std,... when APC is on or off based on the value of the controller status tag. The same philosophy could be applied to get statistics only ...
Eduardo Sanchez over 1 year ago in APC / Trends 0 Evaluating

OSM Improvement proposal - More assets as options in the profile

We would like to have more assets such as "Preferred location" under settings. If you are responsible for several assets, it would be nice if you didn't have to go to settings every time to change which location you should work on/ with. Comment f...
Ashutosh Dubey about 2 years ago in Operational Safety Management / Work Permits 0 Evaluating

OSM Improvement Proposal - Additional column with titles in CoW on last used + adjust the number last displayed

"Additional column with titles in CoW on last used. as well as the ability to adjust the number of last ones displayed in the menu. Made a bad drawing with "additional columns" added as an attachment."
Ashutosh Dubey about 2 years ago in Operational Safety Management / Dashboards / Reporting 0 Evaluating

OSM Improvement proposal - Button to report errors on drawings/ P&IDs

"Sometimes when you make insulation plans, drawings appear with errors that cannot be marked or have other bugs. How about a button in the same image that you can report errors on P&IDs directly to those working on it? Because quite frankly wh...
Ashutosh Dubey about 2 years ago in Operational Safety Management / Administration 0 Evaluating

OSM Improvement Proposal - Being able to link freely chosen ILs into an IP without having to create them from the IP

We would like to be able to link IL lists into IP afterwards without having to create IL from the IP. When I am going to reuse IL lists today, I have to copy a complete IP. I would like to take a list from one IP and another list from another IP. ...
Ashutosh Dubey about 2 years ago in Operational Safety Management / Equipment Isolations 0 Evaluating

OSM Improvement Proposal - Could indicate that tag is referenced on other open IP/IL

Found on Aveva's backlog but should also be recorded from Aker BP
Ashutosh Dubey about 2 years ago in Operational Safety Management / Equipment Isolations 0 Evaluating

OSM Improvement proposal - Isolated safety equipment and compensatory measures

"Description: Be able to inherit this on the IL and override. Requirements. If it is set up on the IP that safety equipment is isolated, at least 1 IL must be unhooked. If it is set up on the IP that safety equipment is NOT isolated, no IL can be ...
Ashutosh Dubey about 2 years ago in Operational Safety Management / Equipment Isolations 0 Evaluating