Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Production Management (AMPLA MES)

Showing 114

Evaluated fields for Material movement items

Material movement items currently do not support evaluated fields. As a part of the Alcoa project, at a certain point in their design, which uses meter marks to capture movements, having evaluated fields on movements would have helped to work out ...
Priyanka VINAYCHANDER over 5 years ago in Production Management (AMPLA MES) / Configuration / Inventory 0 Future consideration

Allow Material conversion to calculate source quantity based on destination quantity

Usually when a material conversion happens in a work center, output movements from that work centers will be in the new material so the measurement available is destination quantity not source. So it will be useful if using a material conversion c...
Mehrnoosh KHODAVERDY over 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Return start and end time in UTC for CLR stored procedured

Currently the start and end time is being returned in local time the request is the CLR stored procedure return this in UTC
Nina NICHOLLS almost 3 years ago in Production Management (AMPLA MES) / Public interfaces 0 Future consideration

Add directional arrows for material specifications

https://dev.azure.com/AVEVA-VSTS/Issue%20Management%20System/_workitems/edit/1844276 Currently material specifications have the bidirectional arrow, customer is requesting the arrow is directional.
Nina NICHOLLS almost 3 years ago in Production Management (AMPLA MES) 0 Future consideration

Use destination material property should display fields from the destination

Requested by BHP Chile Currently today when we set the use destination quality field if the field is present at the source then we display the destination value if the field is only present at the destination but not the source we do not see the f...
Nina NICHOLLS almost 3 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration

Change error level of the Movement Events with 0 or undetermined value from Error to Warning

There are many times when we capture automatic movements the accumulated value is 0 so the source quantity is 0. Or we want to move the available amount but the inventory is empty so we get an error. This means for each movement we always have to ...
Guest almost 3 years ago in Production Management (AMPLA MES) 0 Future consideration

New standard field to capture 'classified by' user

Business impact: It would be very helpful to have the "Classified By" field to capture the actual user info who classifies the record (a ny of the change makes to the fields Cause Location, Cause and Classification). This should be different to La...
Nina NICHOLLS almost 3 years ago in Production Management (AMPLA MES) / General 0 Future consideration

Two factor authentication for PA

https://dev.azure.com/AVEVA-VSTS/Issue%20Management%20System/_workitems/edit/1663438 [System Info] Ampla Versions: v8.0 Operating System: N/A [Raised by] Customer Company: Glencore Clermont Coal Customer Contact: nagabhushanam.parepalli@aveva.com ...
Nina NICHOLLS almost 3 years ago in Production Management (AMPLA MES) 1 Future consideration

Improve material/class constraint validation

https://dev.azure.com/AVEVA-VSTS/Issue%20Management%20System/_workitems/edit/1708334 Global practice team found that no clear message to pinpoint the wrong configuration when material is deleted or not configured. Also validation did not pickup th...
Nina NICHOLLS almost 3 years ago in Production Management (AMPLA MES) 1 Future consideration

Metrics copy/paste

If you copy/ paste a Metrics reporting point, a KPI with resolver hooked to a KPI in the same reporting point should be updated to look at the new reporting point not the original one as it is currently.
Mehrnoosh KHODAVERDY almost 6 years ago in Production Management (AMPLA MES) / Configuration / Metrics 0 Future consideration