Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Production Management (AMPLA MES)

Showing 155

Additional DT CaptureDataWhen condition : EventStateConfirmOnAutoSplit

Business case: RTIO uses PI Asset Framework (AF) to auto classify Ampla Records. PI AF takes a few seconds to calculate the Cause, Classification, and Effect. So, an Ampla DT RP with a StartDelay of 30 seconds, would allow PI AF to carry out the n...
Nina NICHOLLS almost 3 years ago in Production Management (AMPLA MES) 1 Will not implement

Improve material/class constraint validation

https://dev.azure.com/AVEVA-VSTS/Issue%20Management%20System/_workitems/edit/1708334 Global practice team found that no clear message to pinpoint the wrong configuration when material is deleted or not configured. Also validation did not pickup th...
Nina NICHOLLS almost 3 years ago in Production Management (AMPLA MES) 1 Future consideration

Metrics copy/paste

If you copy/ paste a Metrics reporting point, a KPI with resolver hooked to a KPI in the same reporting point should be updated to look at the new reporting point not the original one as it is currently.
Mehrnoosh KHODAVERDY almost 6 years ago in Production Management (AMPLA MES) / Configuration / Metrics 0 Future consideration

Add regional selector for Insights URL

For insights connector configuration it would be good to be able to selcted the region where your instance is hosted and the subsequent url for Insights changes to .net.au or .com.
Matthew GRAHAM almost 6 years ago in Production Management (AMPLA MES) 0 Will not implement

Ampla Health/Performance Reporting

Need a way to capture health/status/performance of the Ampla service. eg. An unlicensed Production RP that captures every X minutes: Seconds since last Historian status tag update CPU RAM Connected Users # of WS Calls etc This would be conne...
Ben CONNOLLY about 6 years ago in Production Management (AMPLA MES) 0 Future consideration

Allow using an evaluated field as the source for another evaluated field in CQ

This feature exist in other RPs but not for CQ. But it is often required. For example we calculate dry tonnes and then we need to calculate Cu tonnes based on the dry tonnes and cu%
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) 0 Future consideration

Pareto chart needs to hide "count" caption and graphic in chart

[Problem Summary]Customer request if it is possible to hide “count” in Pareto chat. In many instances customers do not want to see the count at all as in some data sets (like hydrocarbon transactions) the count is not relevant, only the volume. So...
Nina NICHOLLS over 3 years ago in Production Management (AMPLA MES) 1 Future consideration

Add extra logging of privileged user activities for configuration

Customer has requested about logging of the activities of privileged users relating to configuring a project. This is getting more common requirement from customers.
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) / Configuration 0 Future consideration

allow selective movement event move lot without specify material using material class contraint

https://schneiderampla.atlassian.net/browse/CE-2234[System Info]Ampla Versions: 8.0 MR2Operating System:Windows 2012 Server R2 [Raised by]Customer Company: TalisonCustomer Contact: vy.nguyen@aveva.comSR Reference: 960052444 [Problem Summary] Talis...
Nina NICHOLLS over 3 years ago in Production Management (AMPLA MES) 1 Future consideration

Don't load zero balance lots

https://schneiderampla.atlassian.net/browse/CE-2246 [System Info]Ampla Versions: v8.0 MR3Operating System: N/A [Raised by]Customer Company: BHP-CPMSCustomer Contact: priyanka.v@aveva.com [Problem Summary]As part of BHP inventory we create lots wit...
Nina NICHOLLS over 3 years ago in Production Management (AMPLA MES) 1 Future consideration