Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

Status Implemented
Portfolio area Advisory Group Ideas
Products Process Design
Created by Guest
Created on May 22, 2020

Add option to reset to base case solution between iterations of case study in PRO/II

Normally, PRO/II will use the last iteration as a starting point for the 'next run'. However, when running a case study matrix, this can cause convergence issues. The initial case study may solve, but subsequent case studies may fail due to the starting point (previous solution). If there was an option to “reset to base case solution” it would allow the calculations to return to the same 'state' before each case study variation. Could potentially even do something more sophisticated like resetting only after the case study first variable has gone through all its options and the second variable changes, causing the first one to return to the start.

Idea industry Refining
Idea target user Process Design Engineer
Idea priority 3 – Some use to my company
Idea business value

Would allow for more effective use of the case study feature in PRO/II.

  • Attach files