Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

Status Implemented
Portfolio area Advisory Group Ideas
Products Process Design
Created by Marina Velazquez-Zulueta
Created on Nov 8, 2019

Standard Gas Turbine Model (GT) (McDermott - Willem van Ramshorst)

One of the features of the  “combustion” conversion reaction e.g. CH4 + 2O2 => CO2 + 2H2O is that we can kind of better model a gas turbine (GT) which is used quite frequently since it is a great concept of generating “heat” together with “power”

Please find attached the scan of GTW-2018 single cycle listing which is the “de-facto” bible for GTs and issued once a year

In order to model GTs correctly there are essentially two hurdles to overcome:

  1. The listed information is at “standard” (ISO) conditions
  2. The actual operating conditions needs to be diverted from these standard (ISO) conditions

 

Investigating the literature regarding GTs I found that the efficiency of compression/expansion is quite constant over a wide operating window

Therefore a standard GT simulation will consist out of two parts:

  1. First part is the determination of these compression/expansion efficiencies by using the “standard” (ISO) conditions mentioned in the attached table for a certain GT vendor/type
  2. Second part is the simulation of the same GT under the real operating conditions (air temp/humidity, elevation, fuel type, back pressure) using the in the first part determined efficiencies

 

For you convenience please also find attached such two part simulation (for a Siemens SGT-600)

 

My request now is whether the GT can become a standard module (rather than multiple including calculators and controllers) and whether the attached table can be included updated on a yearly basis so a certain GT vendor/type (like a pull down menu) can be selected and only the real operating conditions can be simulated. Maybe AVAVE can make some revenues by addressing this feature (GT sales tool) to GT vendors for their participation (of course not that we have to pay more license tokens for including this new module).

 

A combined cycle is nothing more than a single cycle including a waste heat boiler for additional steam generation driving a steam turbine for additional power generation as is included in the attached sample file

Idea industry Refining, Petrochemicals, Power
Idea target user Process Design Engineer
Idea priority 4 – Important to my company
Idea business value

If this calculations were part of the standard unit operations, it will save the engineer a rough estimate of 8 hours (one full day) to set up the simulation, plus the avoidance of having to enter all the numbers and equations, counting how often we need this. IT t may save a company an estimate 240 hours  per year. We expect  many companies in the _power, refinery, and petrochemical industries to benefit too

  • Attach files
  • Balamurugan Mohanasundaram
    Jan 12, 2023

    Implemented in AVEVA PRO/II Simulation 2022