Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

Status Considered for roadmap
Portfolio area Advisory Group Ideas
Created by Guest
Created on Nov 8, 2019

Large single network dynamic models that integrate fast

There are many reasons why are dynamic model should integrate faster:

  1.  Faster model building.
  2.  Faster model testing.
  3.  Quicker startup from cold conditions in OTS models.
  4.  Generally faster and more thorough testing through slow transients.

Breaking up the model into various engines is not always desirable because of the nature of the process.  Similarly, faster hardware can be an expensive solution.

 

What I'm proposing is a non-simultaneous solution of thermodynamics in the model.  Only the flows and the pressures should be solved simultaneously.  Thermodynamics should be solved in a sequential-modular method.  This is much faster and does not compromise model accuracy.  In fact, it increases model accuracy because one can solve physical properties rigorously in every time-step.

Idea industry O&G, Midstream, Gas Processing, Refining, Petrochemicals, Polymers
Idea target user Central department simulator expert, Plant engineer, OTS Instructor, OTS Trainee, Simulation model writer, Control engineer
Idea priority 4 – Important to my company
Idea business value

Currently our models run 1-2 times real-time.  If we can run them 5-10 times real-time, it would allow us to use them more often, for more scenarios and for more applications.

  • Attach files