Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

Status Implemented
Portfolio area Advisory Group Ideas
Products Process Design
Created by Stelios Papastratos
Created on Feb 24, 2020

Ability to provide Temperature Initial Estimate in a Stream when Bubble Point Temperature calculation is required [PRO/II] [AVEVA on behalf of European User]

In some cases valid multiple solutions exist for bubble point calculations. It is possible to correctly calculate those multiple solutions in flash by specifying an initial temperature estimate. However this is not possible when a bubble point calculation is requested for a stream because an Initial Temperature Estimate cannot be configured.

 

If it was possible to include a .prz file you could check it. You can see the attached excel file and an image from PRO/II simulation.

 

In PRO/II file (check image) you can see through a case study that indeed multiple bubble point temperatures exist for the same presure.  Those temperatures are correctly calculated in the flash drums F1_1, F1_2, F1_3 if an appropriate initial estimate is provided. In Flash F1_4 the high temperature is calculated without an initial estimate.  Again all solutions are valid as you can see from the relevant trends and plot in excel where a zoom in the multiple solution are is provided.

 

It is clear that the stream BUBBLE will only converge in the high temperature solution. There is no way in a reference stream requesting a bubble point calculation to converge to a different solution. This is the objective objective of this enhancement request initiated by a European PRO/II User

Idea industry O&G
Idea target user Process Design Engineer
Idea priority 3 – Some use to my company
Idea business value

If an initial temperature estimate is not provided then misleading results could be produced. This will save a significant amount of time as it will not be necessary to configure flash objects