Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Production Management (AMPLA MES)

Showing 148

Closing a period enhancement

Customer wants some users being able to modify/add records for the previous shift after the shift ends but some restricted to the current shift. Here confirming of the records at the end of the shift is not enough, because the user still can add n...
Mehrnoosh KHODAVERDY almost 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Add current filter and clear filter to the top of Item search

To make the Item search more intuitive, it is good to have the current selected filter on top of the Item search UI (the same way as PA).Also add a button to clear all existing filters, the same way we have in PA filter builder.
Mehrnoosh KHODAVERDY almost 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Confirm for Inventory

allow confirm /un-confirm for Movement events and quality events
Mehrnoosh KHODAVERDY almost 5 years ago in Production Management (AMPLA MES) / General / Inventory 0 Future consideration

Allow field alignment to be configurable

https://schneiderampla.atlassian.net/browse/CE-1286 [System Info]Ampla Versions: 6.4MR1Operating System:Windows 2012 Server R2 [Raised by]Customer Company: Summa Technology - AlrosaCustomer Contact: David.Hopkins@schneider-electric.comSR Reference...
Nina NICHOLLS almost 5 years ago in Production Management (AMPLA MES) 0 Planned

Improve the Hierarchy selection in Navigation panel

Currently there are 3 hierarchy to select in Navigation Panel (Product, Location and Cause location). all the hierarchies are available to select in all modules even if they are not relevant. It is good to do some make overs in this area so it wil...
Mehrnoosh KHODAVERDY almost 5 years ago in Production Management (AMPLA MES) 0 Planned

chart display settings can be saved into favorites

https://schneiderampla.atlassian.net/browse/CE-1920 [System Info]Ampla Versions: 7.2Operating System:Windows 2012 Server R2 [Raised by]Customer Company: PolyusCF Status: StandardCustomer Contact: priyanka.v@aveva.comSR Reference: 103166101 [Proble...
Nina NICHOLLS almost 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Quality reporting point X-Bar Chart sample size results in last charted value drop significantly

https://schneiderampla.atlassian.net/browse/CE-1891 [System Info]Ampla Versions: 6.5MR1Operating System:Windows 2012 Server R2 [Raised by]Customer Company: RoyhillCF Status: StandardCustomer Contact: kehgan.hau@royhill.com.auSR Reference: 95117946...
Nina NICHOLLS almost 5 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration

Display the timestamp text of Point label in Gantt chart in an adjustable, staggered, resized way

https://schneiderampla.atlassian.net/browse/CE-1950 [System Info]Ampla Versions: v7.2Operating System: N/A [Raised by]Customer Company: BHP Nickel WestCustomer Contact: menghow.yau@electro80.com.au [Problem Summary]When query the downtime records ...
Nina NICHOLLS almost 5 years ago in Production Management (AMPLA MES) 1 Future consideration

Ampla Service Manager: Delete project

Add option to Ampla Service Manager to delete Data database when deleting a project. Most new Ampla engineers find it strange that when they delete a project from Ampla service manager the data database won't get deleted.
Mehrnoosh KHODAVERDY almost 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Business Rules in Production Reporting Points

It would be handy if we could utilise row colour coding (Business Rules) in the production module client grid view (as per the current functionality in the Downtime module). Enabling this feature would greatly enhance the power of the grid view in...
Chris MASTERS almost 5 years ago in Production Management (AMPLA MES) / Production 0 Future consideration