Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 615

Dashboards for Alarms

Be able to assign Alarms to dashboards to create a quick overview of counts and standing time based on the asset model.
Jakob Drescher 7 months ago in Historian & Client / Insight (on-prem) 0

Own button in plant scada studio to start industrial graphics editor

Simple to find for users
Guest over 2 years ago in Plant SCADA / Development Tools 0

Update of change of user-info across network

When changing passwords or adding users, this is currently not automatically copied to other operator-stations in the network. As I understand it we need to add a function that adds the changes, then do a partial compile. This should be a standard...
Guest 5 months ago in Plant SCADA / Other 0

Increase FlowTotalConfig totalblocks from 4 to 6

Increase the total blocks from 4 to 6 (1 additional as a spare)to enable additional elements to be calculated within one flowTotalConfig Flow Rate [0]Current Hour Accum [1]Previous Hour Accum [2]Current Day Accum [3]Current Month Accum [4]
Vitali Unke 2 months ago in Enterprise SCADA Server 0 Future consideration

Native Hardware and Process Historical Alarm logging in SQL database

As current scenario, we can't log historical alarm into SQL database natively. Using alarm category we can log but is has it own limitation. Native functionality like Alarm Upload of CitectHistorian can be real upgrade for CitectSCADA as industry ...
Guest almost 5 years ago in Plant SCADA / Alarms 1 Future Consideration

Higher Visibility for Datapump Issues

Request that there be a better way to tell when Datapump is not pumping.
John Bjartveit 2 months ago in Enterprise SCADA Server / Datapump 0

Make a connection to a PLC without starting Citect

Often connecting to a PLC can be painful. Any change needs to be compiled, Citect restarted, and then you can test the connection. It would be very handy to have a tool in the Citect Studio that lets you play with parameters, IP addresses, a varia...
Guest almost 5 years ago in Plant SCADA / API & Connectivity / Development Tools 1 Future Consideration

Allow classification of multiple events at a time in web client

Currently, in web client customer need to classify each event separately which is very time consuming. Can we classify multiple events at a time in web client ? Customer want checkbox in front of each event. So, customer can select multiple events...
Nina NICHOLLS 3 months ago in Production Management (AMPLA MES) / Web client 0 Future consideration

Being able to filter ArchestrA Graphics as you can for attributes

No description provided
Vincent TOUBLANC 5 months ago in Application Server & OMI / IDE 0

deployment on offline client

To have better use of implementing deployment in our system, i need to update clients that are not on and use in daytime. For instance a laptop can get a message that upgrade is possible and can initiate latest version.
Guest almost 5 years ago in Plant SCADA / Other 1 Future Consideration