Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 507

Be able to constrain a point using the bulk model builder or at templates

Request an enhancement to be able to constrain a point when using the bulk model builder. This would be used on some of our wind models and would help as we build out the 1000+ models. This might be better/more broadly accomplished by just allowin...
Alexander Jenkins over 1 year ago in Predictive Analytics / Model Builder Client 0 Evaluating

Ampla to support Industry 4.0

[Problem Summary] Customer is building a Data Production Model based on Industry 4.0 and is planning to obtain AMPLA data via Industry 4.0 method to the production model data warehouse. The vision for the customer is to move away from the custom s...
Nina NICHOLLS over 1 year ago in Production Management (AMPLA MES) 0 Already exists

Add Ctrl+W as keyboard shortcut for closing window in Graphics Builder.

Standard windows behavior for Ctrl+W should be supported by all windows application in my opinion.
Guest over 1 year ago in Plant SCADA / Development Tools 0

Make Email Alarms generic to support 3rd party notification systems

No description provided
Jake Hawkes over 1 year ago in Enterprise SCADA Server 0 Future consideration

Leverage eDNA Historian as a Trend Data Storage Method in Citect

The eDNA History service is a high performance, lightweight historian. This Historian database would be a great replacement for the older flat file storage mechanism used by Citect. The eDNA historian would provide lossless, highly compressed stor...
Guest about 4 years ago in Plant SCADA / Alarms 0 Future Consideration

OSM Improvement proposal - Button to report errors on drawings/ P&IDs

"Sometimes when you make insulation plans, drawings appear with errors that cannot be marked or have other bugs. How about a button in the same image that you can report errors on P&IDs directly to those working on it? Because quite frankly wh...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Administration 1 Already exists

Historian Point Administration Enhancements

From Alex Jenkins, 2020-04-06 Add search/filter for a specific point (had to scroll through alphabetically). It was ok since I was only looking for 6 points to update, but if there were a lot, this could be tedious. Be able to select only certain ...
Christian-Marc Pouyez over 4 years ago in Predictive Analytics / Model Builder Client 1 Planned

Simple "model health" summary graphic showing status of all individual residuals within a model

Per the attached image, create a summary graphic to show the health of all tags within a model. This provides a simple "at a glance" view of the health of all underlying tags within a model, and can quickly highlight the tags that are contributing...
Guest almost 3 years ago in Predictive Analytics / Web Monitoring Client 0 Future consideration

KPI targets based on calendar loopkup should look at target for each sub period

[Problem Summary]Merhnoosh have found an issue with calendar items used as a target for Metrics KPIs. When you have a calendar item bound to a period (ie daily target), and is used as a target for a metrics KPI, Ampla doesn’t calculate the correct...
Nina NICHOLLS over 4 years ago in Production Management (AMPLA MES) 0 Future consideration

Paste a copied object on the same coordinates as the original object

When pasting a copied object, it would be nice to have the option to paste it at the same coordinates of the copied/original object. Sure, I can note the coordinates using "Adjust Position and Size" and then enter the coordinates on the new obj...
Peter Chung over 1 year ago in Plant SCADA / Graphics / Visualization 0