Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 129 of 831

Update versions active x controls - Process Analyst , Database Exchange or add new ones.

Libraries of Active X haven't been updated in a long time, could use refreshing controls with the new times ;)Everything looks like from 20 years ago.Clients wants New Bargraphs, Gauges, Datapickers for Reports, Textbox, Tables, etc. Are there any...
Guest 5 days ago in Plant SCADA / Graphics / Visualization 0 Submitted

The posibility of declaring larger arrays and update function trngettable.

The possibility of declaring larger arrays in cicode, because the current restrictions do not allow you to make, for example, daily hourly reports, where logging data every 1s needed to calculate the average for the day 86400 number of samples for...
Guest 5 days ago in Plant SCADA / Trends 2 Reviewed & Categorized

Graphics Builder - drawing graphics on layers

This makes drawing large synoptics much easier, because by turning off a given layer you can hide elements. Each object or graphic could have a layer number parameter in its properties. Currently, to apply this, we do it by embedding a genies into...
Guest 5 days ago in Plant SCADA / Graphics / Visualization 0 Submitted

Speed Up Equipment Update

Anyone who has to rename/edit equipment in Studio
Guest 3 months ago in Plant SCADA / Equipment 0 Future Consideration

Reducing Update Package Size

Our customer is using Plant SCADA 2023 R2 (v8.5) and performs monthly product updates aligned with AVEVA’s release cycle. However, the current update process has become difficult and time‑consuming due to their environment and infrastructure limit...
Guest 20 days ago in Plant SCADA / Other 0 Submitted

Remove the Need for pg* Files

Eliminate the requirement for pg*.dbf files. These files are not really needed as the same info is in the .ctg files. These files make it difficult to use PlantSCADA with version control, such as SVN or git since either these files need to be vers...
Will Herndon almost 4 years ago in Plant SCADA / Graphics / Visualization 1 Reviewed & Categorized

SQL outside Cicode or mechanism for inserting data into different database with specific period

When we want use 3rd party tool like Grafana , Node Red, Wordpress and many others we need data from different database. Need a mechanism for transferring data from trend files to the database like MSSQL. MongoDB, MariaDB, MySQL but without write ...
Guest 12 months ago in Plant SCADA / Historic Data / Storage 5 Unlikely to implement

Remove more than 1 version in the deployment server at a time

It would be highly beneficial to introduce the capability to remove multiple versions simultaneously. Additionally, an automated feature to retain only the latest 10 versions.
Peter Chung over 1 year ago in Plant SCADA / Other 0 Reviewed & Categorized

Native MQTT Client

I think it is usefull to add a native MQTT client to Plant SCADA.
Guest over 3 years ago in Plant SCADA / API & Connectivity 4 In Roadmap

Copy+Paste items inside Equipment editor

If we need to add an equal or similar item to several equipments we need to type everything, or if we have several tags in the same equipment and want to add an alarm to all of them, it should be useful to copy the alarm part from one item to othe...
Guest almost 6 years ago in Plant SCADA / Development Tools / Equipment 1 Future Consideration