Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 8 of 776

Improve calculation for availability for long running downtime record

In the customer project, there has been a long running downtime. For the metrics records, during the current shift period, the availability which should be 0 (since there is an active long downtime record) shows a value greater than 0. After the p...
Nina NICHOLLS about 1 year ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

Update Duration for manual downtimes

In Ampla, duration is automatically updated only for open downtimes captured by Ampla (automatic). Manual open downtime durations are not updated automatically. Usually, a code item has to be written to update the duration of manual downtimes. Ref...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

Tollerance factor value change in case the flow meter measured value is out of pre-defined range

Flow meter's accuracy changes when measure value is out of range. Hence, there should be a mechanism to support this feature with-in the application. This can be enabled with logical conditional statements for tolerance value settings. Instead of ...
Kiran Karumuri over 2 years ago in Production Accounting / New features request 0 Planned

Valve equation generation with-in the application as utility

Flow estimation valve equation being generated outside the application and same being configured with-in the application during project implementation stage. Utility with-in the application will not only enables the services and also the customer ...
Kiran Karumuri over 2 years ago in Production Accounting / General 0 Planned

Node Balance report generation with-in APA

Many customers looks at node wise balance report to track the imbalances at micro level to check, review and validate. Manual report configuration and preparation is cumbersome and time taking. Auto generation of node wise report with-in the appli...
Kiran Karumuri over 2 years ago in Production Accounting / Reports 0 Planned

Overlapping downtime events

We have request from both Alrosa and Polyus to allow for some mechanism to identify downtime records which overlap. Currently you can have overlapping records for manual records.
Mehrnoosh KHODAVERDY over 5 years ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

Access to Ampla Downtime Configuration via webservices

[Enhancement Request]Customer would like the ability to extract Downtime RP related configuration information through Ampla Web Services/CLR. Currently, Delay Accountants contact the Ampla Maintenance Group to get this information where the mainte...
Nina NICHOLLS about 6 years ago in Production Management (AMPLA MES) / Configuration / Downtime / Web API 0 Future consideration

Provide the ability to add conditional mandatory fields in the downtime delay entry form

Ideally, a user could be forced to add additional info when they select a specific value in a delay entry form field. e.g. When a user selects 'Broken, damaged, Bent' as a cause code, force them to provide some form of comment. Mechanical failures...
Chris MASTERS almost 7 years ago in Production Management (AMPLA MES) / Client / Configuration / Downtime 0 Future consideration