Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 23 of 776

Auto-sync objects from Data Services

Data services is the system of record and customer would like to see Advanced Analytics reflect the current state of objects (asset, streams, metadata) in Data Servies
Glenn Moffett 11 months ago in Advanced Analytics 0 Needs review

Support time series analysis in thread logic block

When doing time series analysis, right now there is no possiblity to let the thread look for a previous or next event (like in PI PE syntax). This makes time series analysis more challenging as one has to define a specific time range and look with...
Hans-Otto Weinhold 6 months ago in Advanced Analytics 0 Needs review

Better Preview possibilites of Thread reload

When creating a thread logic, right now there is no backfilling preview feature available which would allow to get a preview on an event creation logic within a logic block or when doing a calculation. It would be good to have a similar preview fe...
Hans-Otto Weinhold 6 months ago in Advanced Analytics 0 Needs review

Expose AVEVA Advanced Analytics outputs to Data Hub - e.g. recommendations

the key output from AAA is often not just the anomaly score. More interesting will be things like ideal running conditions, ideal model conditions.
Guest almost 2 years ago in Advanced Analytics 0 Needs review

Improve Readability of the SuperFlo Verbose Logs

The customer would like the verbose logs recorded by the SuperFlo protocol to more closely resemble those of xMODBUS.
Sean Stovall over 1 year ago in Enterprise SCADA Server / Protocols and Commlines 0

Update SNMP protocol to support v3

Big Picture User Experience Support v3 of the SNMP protocol Detailed Description TBD: any particular SNMP v3 features?
Randy Kostiuk over 2 years ago in Enterprise SCADA Server / Protocols and Commlines 6 Future consideration

Add ability for Omnicomm to support secure connections to devices

Enterprise SCADA desires to be at the forefront of security. Many protocols are beginning to support SSL/TLS connections to the end device, thus finally protecting that last few feet of communications from the networking equipment to the device. F...
Collin Heggerud almost 2 years ago in Enterprise SCADA Server / API / SDK / Developer Relations / Omnicomm / Protocols and Commlines / Security and DMZ 7 Reviewing

Events duration column should be a timespan rather than a decimal

When viewing events in AVEVA Advanced Analytics, the duration column shows the event duration as a decimal value representing the number of hours the event was open. For example, a duration of 0.1 = 6 minutes. This is not immediately intuitive, an...
Guest about 1 year ago in Advanced Analytics 0 Needs review

Improvements to OPC Client

Enhance the OPC Client such that it can handle third-party OPC Servers that present 10,000+ points as one remote. This "idea" relates to GCS ticket # 960321526.
Craig Parkin about 2 years ago in Enterprise SCADA Server / Protocols and Commlines 1 Waiting for information

IEC-104

IEC60870-101 or IEC60870-104 are the serial and IP versions of what is sometimes refered to IEC-104. These are both part of the IEC60870-5 standard, whereas ICCP is IEC60870-6, and is different. IEC_62351 is a standard for securing the various pro...
Josie Liu over 5 years ago in Enterprise SCADA Server / Omnicomm / Protocols and Commlines / Telemetry 0 Reviewing