Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 41 of 776

Evaluated fields for Material movement items

Material movement items currently do not support evaluated fields. As a part of the Alcoa project, at a certain point in their design, which uses meter marks to capture movements, having evaluated fields on movements would have helped to work out ...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Configuration / Inventory 0 Future consideration

Metrics copy/paste

If you copy/ paste a Metrics reporting point, a KPI with resolver hooked to a KPI in the same reporting point should be updated to look at the new reporting point not the original one as it is currently.
Mehrnoosh KHODAVERDY almost 7 years ago in Production Management (AMPLA MES) / Configuration / Metrics 0 Future consideration

Allow planning module to be used in metrics KPI resolver

https://dev.azure.com/AVEVA-VSTS/Issue%20Management%20System/_workitems/edit/1877803 Allow planning module to be selected by metrics KPI resolver
Nina NICHOLLS over 3 years ago in Production Management (AMPLA MES) / Metrics 0 Future consideration

Use destination material property should display fields from the destination

Requested by BHP Chile Currently today when we set the use destination quality field if the field is present at the source then we display the destination value if the field is only present at the destination but not the source we do not see the f...
Nina NICHOLLS over 3 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration

Add evaluated fields for knowledge RP

Currently evaluated fields don't exist for Knowledge RP, however they are very handy as they are many cases some simple calculations are required in the shift log:An example raised by Naga for Clermont:In the Shift Log they have some numeric info(...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Knowledge 0 Future consideration

Add evaluated fields for movements

There is different scenarios when an evaluated fields required on a movement. For example when you have online analyzers which give you the estimated grade or moisture and you would like to be able to have the dry tonnes or fine material in the mo...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Improve UseAvailableQuantity

Improve UseAvaiableQuantity behaviour to only do the movement when the balance in not 0. Currently many movements are failing processing because when the movement is triggered there is no balance in the lot group, and since there is no way to chec...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Add balance views over time group by a period

When you look at the balance over time views, you usually need to see how it has been changed by a period, for example what was the balance at the end of each shift for a month. But the current balance over time views shows all the changes to the ...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Movement without specifying LG from a WC with Mandatory LG

Currently if you have a movement from a WC you have to specify the Source LG, otherwise it consider the movement from NULL LG. In reality, in many cases the movement out of a WC requires to move material out of all lot groups in the WC as there is...
Mehrnoosh KHODAVERDY about 5 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

thresholds and specifications for MQ evaluated fields

https://schneiderampla.atlassian.net/browse/CE-2127 System Info]Ampla Versions: v7.3Operating System: N/A [Raised by]Customer Company: BMAContact: <rodney.banister@aveva.com> [Problem Summary] : In quality module customer need to have Specif...
Nina NICHOLLS about 5 years ago in Production Management (AMPLA MES) / Material Quality 1 Future consideration