Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 544

Define DCS Readback and DCS Status

When defining these tags in a controller, allow them to be selected from a list of all Input Tags, with possibility to apply a filter to limit the size of the presented list. Currently we have to enter the text directly with all kinds of possibili...
Geoff Lewis over 1 year ago in APC / Controller Configuration 0 Evaluating

Convert Raw Tag to Custom

Currently it is possible to convert a Custom Tag to Raw Tag, but not vice versa. This would be v helpful when migrating controllers.
Geoff Lewis over 1 year ago in APC / General 0 Evaluating

Use TagInfoEx() to check whether an alarm exists

If you have an equipment type with an item and this creates a variable tag and an alarmtag you could use the TagInfoEx() function to check whether this item has an alarm defined. Let me give an example: Equipment:Motors.M1 Item:Run Variable Tag Na...
Guest over 1 year ago in Plant SCADA / Equipment 0

prescriptive actions as task list

Prescriptive actions are very relevant and frequently hard to read as displayed in 2 row text field. It would be great if this can be displayed as a clear task list with the possibility to expose also on APIs so it can be leveraged by other soluti...
Luca Bruni over 1 year ago in Predictive Analytics / Web Monitoring Client 1 Planned

Temporarily add / overlay tags that are not included in a model, when analysing model OMR

This is a direct request from an end-user. Sometimes there are tags outside of a model that will provide useful context to the analyst in reviewing an anomaly within Web Monitoring Client. At the moment this requires the user to separately a...
Guest over 3 years ago in Predictive Analytics / Web Monitoring Client 0 Evaluating

Update Duration for manual downtimes

In Ampla, duration is automatically updated only for open downtimes captured by Ampla (automatic). Manual open downtime durations are not updated automatically. Usually, a code item has to be written to update the duration of manual downtimes. Ref...
Priyanka VINAYCHANDER about 5 years ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

Prediction Mode (Open Loop)

Provide a "prediction mode" for the controller where it can read the values from the DCS and predict the steady state values of the CVs but it cannot write back the setpoints to PID controller in DCS. Read-only connectivity to the DCS, moves are c...
Ina Llewellyn over 1 year ago in APC / Connectivity 1 In development

Treeview page navigation with alarm count

Make a treeview page navigation with alarm count for equipment related to the page. The ExampleSA button navigation looks outdated, and a treeview navigation with alarmcount would be an upgrade. Just like the equipment treeview in the alarm and tr...
Guest 11 months ago in Plant SCADA / Graphics / Visualization 0 Future Consideration

Support of tableau Embedded/Power BI Embedded into Insight Asset page.

Purpose of this feature is to leverage external content such as dashboard in an embeeded and contextual way. It might requires a simple Insigth widget operating as as a web browser or ideally as an iFrame container which could be configured by jus...
Damien Rouge over 4 years ago in Insight BI Gateway / Dashboard 0 No status

Graphics Builder Goto Object Enhanced Functionality

The Goto Object in the graphics builder is particularly useful when you have grouped objects, but each time you double click to bring up the animation the Goto Object form closes. It would be great if the form could be docked or simply stay open o...
Guest 11 months ago in Plant SCADA / Graphics / Visualization 1 Unlikely to implement