Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Plant SCADA

Showing 114

Trend history file modification

Currently any change to a trend in Citect means having to discard the trend history files, for example changing the Sample Period. Would it be possible to have Citect modify the history files automatically? There are tools in the Toolbox to achiev...
Guest almost 5 years ago in Plant SCADA / Alarms 1 Future Consideration

Grace period HW alarm

It would be great to get a HW alarm when a license is entering a grace period. It is not every day that you log into the AEL and check the status. Furthermore, it has happened that someone has moved a VM instance to another machine without knowing...
Peter Chung almost 2 years ago in Plant SCADA / Alarms 1 Future Consideration

Push all data type of Variables to AVEVA Historian

Currently, The CitectSCADA connector reads Trend tags, SPC, Alarm tags, and Variables (String and Digital data type) info from Plant SCADA and writes data to AVEVA Historian. It would be better to have other data type variables, like Int, Long, re...
Guest over 1 year ago in Plant SCADA / Other 3 Unlikely to implement

Faster compiler

The old compiler needs to utilize modern hardware better to decrease compile-time. Also applies to other tools who I suspect uses same/similar routines working with DBFs and such. Like page update and packing, etc.
Guest over 1 year ago in Plant SCADA / Development Tools 0 Future Consideration

Add ability to lock guidelines in Graphics Builder (so they dont change when you accidentally click them)

The problem is: in the graphics builder the guidelines can be clicked or dragged using the mouse, and then they change! Whilst dragging is quite a conscious action, clicking something is easily done accidentally. You are not warned that you clicke...
Guest about 3 years ago in Plant SCADA / Graphics / Visualization 1 Unlikely to implement

Process Analyst connects to WW Historian

Process Analyst can connect to Citect Historian ,ref to picture. Then is should be possible to connect to Aveva Historian alias WW Historian.
Guest over 4 years ago in Plant SCADA / Alarms 0 In Roadmap

Edit Equipment types with a table tool like Excel

when it is needed to update a lot (not all) of variable and trend definitions for example Historian = true within an equipment type. Browsing to the item, opening the definition, add the field and set the value to true will take a lot of time. Whe...
Guest about 2 years ago in Plant SCADA / Equipment 3 Unlikely to implement

Enlarge the tables in the kernel

For instance the CSAToPSI.Subs, it starts with the cluster name, then the tag, which can 79 characters. You can only see 29 characters. Also in a kernel dump the length is limited. Also sorting on different colums would be helpfull.
Guest almost 2 years ago in Plant SCADA / Kernel & Diagnostics 0

Better keyboard support in Graphics Builder

A lot of potential Graphics Builder tasks can be repetitive, and can be sped up using a keyboard instead of a mouse. But some dialogues are not keyboard friendly. The specific case I have in mind is Tools -> Swap Colours. Opening it from the ke...
Guest 12 months ago in Plant SCADA / Graphics / Visualization 1

Add 64-bit INT to Modbus Driver

Device manufacturers (especially Schneider) are increasingly using 64-bit integers for data. The present Modbus TCP driver does not support 64-bit INT so integration of these devices results in unsatisfactory limits on data. The Modbus driver need...
Guest over 1 year ago in Plant SCADA / Drivers / Protocols 1