Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 507

Sample Period filter for Planning

In Planning, there is a need to be able to see into the future (Sample Period filter). Currently, the filter (Period Specifier) options only include Current, Last, Custom and Beginning. Would like the ability to be able to add a favorite where you...
Priyanka VINAYCHANDER almost 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Allow images to be attached to knowledge reporting point

https://schneiderampla.atlassian.net/browse/CE-1886 [System Info]Ampla Versions: 7.2.0.432Operating System:Windows 2012 Server R2 [Raised by]Customer Company: Coronado Curragh Pty LtdCF Status: EliteCustomer Contact: nagabhushanam.parepalli@aveva....
Nina NICHOLLS almost 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Command time out for P2B commands

Adding this in as requested by SoT for Polyus Database2Ampla integration the command time out cannot be changed. It will always use the default 30 s. Other parts of the product provide this ability
Priyanka VINAYCHANDER about 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Calculated Inventory configuration

When a Calculated Inventory Source field is configured under Inventory configuration item. It is mandatory for all Material Quality reporting points in the project to have this as a field. In reality, not all reporting points will need all of the ...
Priyanka VINAYCHANDER about 5 years ago in Production Management (AMPLA MES) 1 Will not implement

Ability to add Contributors at runtime

Currently, it needs to be configured and there is no way to add additional contributors or contribution types at runtime. This has been requested by SoT and IS3. ------------------------------------------------------------------------------ Can we...
Priyanka VINAYCHANDER about 5 years ago in Production Management (AMPLA MES) 1 Will not implement

Allow Material to be a Source field for Material Quality Evaluated fields

For Material Quality Evaluated fields standard fields like Material cannot be added as Source. This would be useful for evaluating expressions, when a Material Quality reporting point is associated with more than one material. This was something t...
Priyanka VINAYCHANDER about 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Configuration CLR Stored procedure

As Standard reports will not be available in the future releases, it is important to create some general sample reports that can be used for projects without customization. To achieve this we need to be able to get some configuration information u...
Mehrnoosh KHODAVERDY about 5 years ago in Production Management (AMPLA MES) / CLR stored procedures 0 Future consideration

Add Cause location location ID (or EquipmentIdentifier) to downtime standard fields

EquipmentIdentifier is the unique identifier in the plant hierarchy which is usually the id from SAP or Asset Management system. However this field is only available in the grid for location (as locationIdentifer) not for cause location. As many c...
Mehrnoosh KHODAVERDY about 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Setting permissions on project root

In many projects we use the same permissions all over the project. I suggest to allow setting the permissions on the project root level. Currently you only can set it in root children and as the result you have to break the permission in multiple ...
Mehrnoosh KHODAVERDY about 5 years ago in Production Management (AMPLA MES) / Configuration 0 Future consideration

Ampla Chart enhancements

We have got some requests about chart settings, most recently these ones: To be able to have multiple axis To be able to change the filling color (currently you only can change the line color or second color) Charts are not rendering well (ie not ...
Mehrnoosh KHODAVERDY about 5 years ago in Production Management (AMPLA MES) / Charting 0 Future consideration