Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 583

Allow CGL to reuse meter run configuration resulting in better configuration experience

No description provided
Vitali Unke 4 months ago in Enterprise SCADA Server 0 Reviewing

EPCO: Alternate Alarm Limit Enhancements

Big Picture User Experience Enterprise is asking for the following enhancements to Alternate Alarm Limits: opening the point's events on a record's control panel should show: changes made to the almlimit, and the almlimitset record that it was i...
Vitali Unke 6 months ago in Enterprise SCADA Server 0 Reviewing

Deprecate the groupArray field and datatype in the Area table

Big Picture User Experience Deprecate both the area field and the groupArray type in the realtime schema. Detailed Description The groupArray field holds information that was synced from ADAM. It is currently hard-limited to 20 groups, whereas the...
Vitali Unke 7 months ago in Enterprise SCADA Server 0 Will not implement

Ability to run cmxrepclient and DPutil from a non-realtime server

Email from GCS / Customer: "According to the new architecture in which the Realtime and Historical servers are installed with Windows CORE; we need to run all OASyS tools from the Support Server, especially during a Mode Switch, in which we need t...
Jake Hawkes 10 months ago in Enterprise SCADA Server 0 Reviewing

Update Datapump to take advantage of DACPACs

DACPACs were intalled in v2021. This would be to update datapump to be DACPAC friendly, and eliminate the SQLinstallTool from the product. Estimated in April 2020 as (XL T-Shirt size) (~80-90 SP)
Vitali Unke 10 months ago in Enterprise SCADA Server 0

Testing as a Service

Multiple customers have offered to share their test scripts with us to improve our ability to test usage that better matches customer environments.

ADE respects custom fields in remconnjoin table

Big Picture User Experience It was found that custom fields added to the remconnjoin table are blanked out when ADE edits are made. Detailed Description Custom fields are not blanked by ADE when edits are made. If a project has a VDB override in p...
Jake Hawkes 10 months ago in Enterprise SCADA Server 0 Will not implement

Support OS live upgradability

Big Picture Support live OS upgradability after Enterprise SCADA has been upgraded to v2023, without the need for a cold start. Detailed Description It is currently assumed that it will be required to update the OS from one major version to the ne...
Jake Hawkes about 1 year ago in Enterprise SCADA Server / Administration / Installation / Architecture 0 Reviewing

Alarm should be generated when Omnicomm stops polling a connection record due to being added to the bad hosts list

Create an alarm when omnicomm detects DNS issues and puts a connection offscan.
Jake Hawkes about 1 year ago in Enterprise SCADA Server / Alarms / Omnicomm / Protocols and Commlines 1 Reviewing

Alarms should update group when the related point changes group

When a point generates an alarm, the alarm gets the same AOR Group as the point, and based on the AOR Group users can or cannot see the alarm and acknowledge it. But if after the alarm is generated the responsibility group is modified in the point...
Jake Hawkes about 1 year ago in Enterprise SCADA Server 1 Will not implement