Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Enterprise SCADA Server

Showing 68

Increase FlowTotalConfig totalblocks from 4 to 6

Increase the total blocks from 4 to 6 (1 additional as a spare)to enable additional elements to be calculated within one flowTotalConfig Flow Rate [0]Current Hour Accum [1]Previous Hour Accum [2]Current Day Accum [3]Current Month Accum [4]
Vitali Unke about 23 hours ago in Enterprise SCADA Server 0 Future consideration

Higher Visibility for Datapump Issues

Request that there be a better way to tell when Datapump is not pumping.
John Bjartveit 2 days ago in Enterprise SCADA Server / Datapump 0

NMC Start All Services on Computer

As a SCADA Administrator, I would like to be able to start all services on machines within my environment in addition to existing service-by-service capabilities, so that I can save time during service startup activities such as post-patching.

flowTotalConfig integration blocks replication enhancement request

Our customer has a business need to be able to manually adjust previous hour/day/month etc of a flowTotal record. So that it provides accurate information in the control room so that GCN records can be met and gas used can be properly tracked.Ofte...
Vitali Unke about 2 months ago in Enterprise SCADA Server 0

ADLDS default configuration for sound alerts in AdminPager, and user-level preferences that do not require starting the application

Big Picture User Experience Make AdminPager react to the user's options preference (i.e. no sound immediately), and persist for that user on a machine by machine basis.Make AdminPager set the default Option to those stored in AD for the computer i...
Guest 4 months ago in Enterprise SCADA Server 0 Reviewing

Make it easier to run Enterprise SCADA (OASyS) in the cloud

Background More and more opportunities are asking for Enterprise SCADA to be run in the cloud in a PaaS environment such as AWS, Azure and other PaaS vendors. Currently, the product is designed solely for on-premise deployments, and there are cert...
Kevin Mackie 9 months ago in Enterprise SCADA Server / Cloud 1

(PMFR-479) Alarm Summary display should have a safer mechanism to acknowledge alarms to assure the correct alarm is being acknowledged

Alarm Summary display should have a safer mechanism to acknowledge alarms to assure the correct alarm is being acknowledged PMFR-479
Jake Hawkes over 1 year ago in Enterprise SCADA Server / Alarms 0 Reviewing

Document all Configuration JSON files

Global Practice has requested that documentation to catalog the various user-modifiable JSON files and their full list of parameters, potential values, limitations, and most importantly their purpose and effect on the system. They have also asked ...
Jason New about 1 year ago in Enterprise SCADA Server / Administration / Installation / Documentation 1 Future consideration

Alarm suppression with an analog parent-value comparator.

Alarm suppression with an analog parent-value comparator. Idea collected at Pipeline Summit 2023
Guest 10 months ago in Enterprise SCADA Server / Alarms 0

Enhance water-sqrt rate subtype

TS analysis: TS has confirmed that water-sqrt has been an available choice for the rate subtype in 2018 through 2023.(water-sqrt.PNG attached) However, the documentation for rate subtype only lists and describes the other 3 options - linear, liqui...