Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 31 of 776

Support for flowtotals as flowpath input into pressmon

Support for flowtotals as flowpath input into pressmon.
Andrew Potkins 2 months ago in Pipeline Operations for Liquids 1

Automatic Ticket Splits on MCF Changes

Earlier releases of OASyS metering/ticketing allowed a user to configure their logical meters ("batmtrs") to perform a ticket split when the meter correction factor ("MCF") changed. As a result, the completed ticket for the previous accumulation w...
Daniel Bennett over 1 year ago in Pipeline Operations for Liquids / Batches / Tanks 2 Waiting for information

Improve calculation for availability for long running downtime record

In the customer project, there has been a long running downtime. For the metrics records, during the current shift period, the availability which should be 0 (since there is an active long downtime record) shows a value greater than 0. After the p...
Nina NICHOLLS about 1 year ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

Are there plans in the future to add water level to tanks?

Batch transfer application has the capability of compensating for sediment and water in order to calculate an NSV. A batchXfer record can be configured with an S&W (%) input analog for the purpose. Is there any plan to adopt that into tanking ...
Guest over 1 year ago in Pipeline Operations for Liquids 1

Allow adjustment of quality balance

The problem customer is facing is mismatching Quality Balance with Lot Group Balance. They would like to reset a given lot group such that Quality Balance = Lot Group Balance. Quality survey is not an option as it simply set the quality of the who...
Nina NICHOLLS over 1 year ago in Production Management (AMPLA MES) / Inventory / Material Quality 0 Future consideration

Update Duration for manual downtimes

In Ampla, duration is automatically updated only for open downtimes captured by Ampla (automatic). Manual open downtime durations are not updated automatically. Usually, a code item has to be written to update the duration of manual downtimes. Ref...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

BalanceByLotGroupAtPointInTime

We need a way to get the inventory data at a point in time. Can we have a sample period filter that sets for a point in time and this would be applied to the Balance, Balance by lot/lot group views. Currently the only work around is to select Over...
Kyriacous SAMATA over 6 years ago in Production Management (AMPLA MES) / Client / Inventory 0 Future consideration

Initialization of Virtual Flow Computer GSV

We would like to be able to modify the starting point or current value of the GSV of a VFC.
Guest about 2 years ago in Pipeline Operations for Liquids 2

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Evaluate fields when Quality moved forward

Evaluated fields are not calculated when quality is moved forward. This would be an issue for the Material Accounting solution. In the configuration below, Re_SO4 for WorkCenter2 will not be evaluated for a QMF record. (We just need to run the eva...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration