Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Inventory

Showing 10

Allow adjustment of quality balance

The problem customer is facing is mismatching Quality Balance with Lot Group Balance. They would like to reset a given lot group such that Quality Balance = Lot Group Balance. Quality survey is not an option as it simply set the quality of the who...
Nina NICHOLLS 6 months ago in Production Management (AMPLA MES) / Inventory / Material Quality 0 Future consideration

BalanceByLotGroupAtPointInTime

We need a way to get the inventory data at a point in time. Can we have a sample period filter that sets for a point in time and this would be applied to the Balance, Balance by lot/lot group views. Currently the only work around is to select Over...
Kyriacous SAMATA over 5 years ago in Production Management (AMPLA MES) / Client / Inventory 0 Future consideration

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Evaluated fields for Material movement items

Material movement items currently do not support evaluated fields. As a part of the Alcoa project, at a certain point in their design, which uses meter marks to capture movements, having evaluated fields on movements would have helped to work out ...
Priyanka VINAYCHANDER about 5 years ago in Production Management (AMPLA MES) / Configuration / Inventory 0 Future consideration

Add evaluated fields for movements

There is different scenarios when an evaluated fields required on a movement. For example when you have online analyzers which give you the estimated grade or moisture and you would like to be able to have the dry tonnes or fine material in the mo...
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Improve UseAvaiableQuantity

Improve UseAvaiableQuantity behaviour to only do the movement when the balance in not 0. Currently many movements are failing processing because when the movement is triggered there is no balance in the lot group, and since there is no way to chec...
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Add balance views over time group by a period

When you look at the balance over time views, you usually need to see how it has been changed by a period, for example what was the balance at the end of each shift for a month. But the current balance over time views shows all the changes to the ...
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Movement without specifying LG from a WC with Mandatory LG

Currently if you have a movement from a WC you have to specify the Source LG, otherwise it consider the movement from NULL LG. In reality, in many cases the movement out of a WC requires to move material out of all lot groups in the WC as there is...
Mehrnoosh KHODAVERDY almost 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Material conversion enhancements

Material conversion as its current form is not useful in most scenarios. There are two enhancements that can make it work for many scenarios: Allow calculation of source quantity based on the destination quantity: Most of the time when you have a ...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Confirm for Inventory

allow confirm /un-confirm for Movement events and quality events
Mehrnoosh KHODAVERDY almost 5 years ago in Production Management (AMPLA MES) / General / Inventory 0 Future consideration