Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 16 of 791

Speed Up Equipment Update

Anyone who has to rename/edit equipment in Studio
Guest about 2 months ago in Plant SCADA / Equipment 0 Future Consideration

SQL outside Cicode or mechanism for inserting data into different database with specific period

When we want use 3rd party tool like Grafana , Node Red, Wordpress and many others we need data from different database. Need a mechanism for transferring data from trend files to the database like MSSQL. MongoDB, MariaDB, MySQL but without write ...
Guest 11 months ago in Plant SCADA / Historic Data / Storage 5 Unlikely to implement

Copy+Paste items inside Equipment editor

If we need to add an equal or similar item to several equipments we need to type everything, or if we have several tags in the same equipment and want to add an alarm to all of them, it should be useful to copy the alarm part from one item to othe...
Guest almost 6 years ago in Plant SCADA / Development Tools / Equipment 1 Future Consideration

Unify automatic generation of Configuration Parameters in Plant SCADA Studio 2023 and Equipment Editor

Currently when adding new Equipment through Equipment Editor, all relevant Configuration Parameters will be generated automatically and are available in Plant SCADA Studio 2023. However if you add a new Equipment in Plant SCADA Studio and run "Upd...
Guest almost 3 years ago in Plant SCADA / Equipment 1

Edit Equipment types with a table tool like Excel

when it is needed to update a lot (not all) of variable and trend definitions for example Historian = true within an equipment type. Browsing to the item, opening the definition, add the field and set the value to true will take a lot of time. Whe...
Guest almost 3 years ago in Plant SCADA / Equipment 3 Unlikely to implement

Equipment editor use patterns

When creating Equipment types it will save a lot of time when it is possible to use pattern’sFor example when creating an alarm several Item’s need to be created with the same structure: <alarm>_Suppression <alarm>_Condition <alarm&...
Guest almost 3 years ago in Plant SCADA / Equipment 2 Future Consideration

Search and replace inside Equipment Editor

When we have diferent equipments with same comun branch and need to change them all, its a lot of work, because we need t go to each equipment open it search the item, open it and change.
Guest almost 6 years ago in Plant SCADA / Development Tools / Equipment 0 Future Consideration

Alarm Page and Historical SOE list with Time filter

We are getting complaints from customer that the Alarm Page and Historical SOE do not have to capability to filter lists on Time. This case has been discussed in the Community . And there has been several feedbacks form the Community to AVEVA on t...
Guest about 4 years ago in Plant SCADA / Historic Data / Storage 2

Add {equipment.ItemName} to reference objects in Equipment Editor

When working with a PLC that uses name based tags, such as Rockwell Control Logix 5000 series, creating equipment results in repetitive typing or copy and pasting which is not only time consuming, but adds possible user error when entering tags. F...
Guest about 4 years ago in Plant SCADA / Development Tools / Equipment 1

SOE Filter functions -SA Project template

The default SA Project template, comes with SOE list where system alarms and states are defaulted to be shown independent of any filter applied. From what I see this comes form the FUNCTION _AlarmPage_UpdateFilter() being set with "OR StateNumeric...
Guest about 4 years ago in Plant SCADA / Historic Data / Storage 0