Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 31 of 791

SQL outside Cicode or mechanism for inserting data into different database with specific period

When we want use 3rd party tool like Grafana , Node Red, Wordpress and many others we need data from different database. Need a mechanism for transferring data from trend files to the database like MSSQL. MongoDB, MariaDB, MySQL but without write ...
Guest 11 months ago in Plant SCADA / Historic Data / Storage 5 Unlikely to implement

Alarm Page and Historical SOE list with Time filter

We are getting complaints from customer that the Alarm Page and Historical SOE do not have to capability to filter lists on Time. This case has been discussed in the Community . And there has been several feedbacks form the Community to AVEVA on t...
Guest about 4 years ago in Plant SCADA / Historic Data / Storage 2

SOE Filter functions -SA Project template

The default SA Project template, comes with SOE list where system alarms and states are defaulted to be shown independent of any filter applied. From what I see this comes form the FUNCTION _AlarmPage_UpdateFilter() being set with "OR StateNumeric...
Guest about 4 years ago in Plant SCADA / Historic Data / Storage 0

Improve calculation for availability for long running downtime record

In the customer project, there has been a long running downtime. For the metrics records, during the current shift period, the availability which should be 0 (since there is an active long downtime record) shows a value greater than 0. After the p...
Nina NICHOLLS about 1 year ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

Ability to view and export trend data in SCADA trend server or from SCADA Connector for better debugging.

I ran into an issue where I want to see how many months of trend data is cached in SCADA Trend server, and I would like the ability to manually export this data for manual import into Historian.
Guest over 3 years ago in Plant SCADA / Historic Data / Storage 0

Allow adjustment of quality balance

The problem customer is facing is mismatching Quality Balance with Lot Group Balance. They would like to reset a given lot group such that Quality Balance = Lot Group Balance. Quality survey is not an option as it simply set the quality of the who...
Nina NICHOLLS over 1 year ago in Production Management (AMPLA MES) / Inventory / Material Quality 0 Future consideration

Update Duration for manual downtimes

In Ampla, duration is automatically updated only for open downtimes captured by Ampla (automatic). Manual open downtime durations are not updated automatically. Usually, a code item has to be written to update the duration of manual downtimes. Ref...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

BalanceByLotGroupAtPointInTime

We need a way to get the inventory data at a point in time. Can we have a sample period filter that sets for a point in time and this would be applied to the Balance, Balance by lot/lot group views. Currently the only work around is to select Over...
Kyriacous SAMATA over 6 years ago in Production Management (AMPLA MES) / Client / Inventory 0 Future consideration

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Evaluate fields when Quality moved forward

Evaluated fields are not calculated when quality is moved forward. This would be an issue for the Material Accounting solution. In the configuration below, Re_SO4 for WorkCenter2 will not be evaluated for a QMF record. (We just need to run the eva...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration