Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 12 of 776

Omnicomm retries on temporary connections should retry the connection

On Tech Support case 962469169 it became very clear that when the socket of a temporary connection was broken, Omnicomm would not re-attempt the connection until the next scheduled poll interval (e.g., 5 minutes later). I would expect that if Omni...
Collin Heggerud 2 months ago in Enterprise SCADA Server / Omnicomm / Protocols and Commlines 0

Improve Readability of the SuperFlo Verbose Logs

The customer would like the verbose logs recorded by the SuperFlo protocol to more closely resemble those of xMODBUS.
Sean Stovall over 1 year ago in Enterprise SCADA Server / Protocols and Commlines 0

Update SNMP protocol to support v3

Big Picture User Experience Support v3 of the SNMP protocol Detailed Description TBD: any particular SNMP v3 features?
Randy Kostiuk over 2 years ago in Enterprise SCADA Server / Protocols and Commlines 6 Future consideration

Add ability for Omnicomm to support secure connections to devices

Enterprise SCADA desires to be at the forefront of security. Many protocols are beginning to support SSL/TLS connections to the end device, thus finally protecting that last few feet of communications from the networking equipment to the device. F...
Collin Heggerud almost 2 years ago in Enterprise SCADA Server / API / SDK / Developer Relations / Omnicomm / Protocols and Commlines / Security and DMZ 7 Reviewing

Improvements to OPC Client

Enhance the OPC Client such that it can handle third-party OPC Servers that present 10,000+ points as one remote. This "idea" relates to GCS ticket # 960321526.
Craig Parkin about 2 years ago in Enterprise SCADA Server / Protocols and Commlines 1 Waiting for information

IEC-104

IEC60870-101 or IEC60870-104 are the serial and IP versions of what is sometimes refered to IEC-104. These are both part of the IEC60870-5 standard, whereas ICCP is IEC60870-6, and is different. IEC_62351 is a standard for securing the various pro...
Josie Liu almost 6 years ago in Enterprise SCADA Server / Omnicomm / Protocols and Commlines / Telemetry 0 Reviewing

Allow protocol specific extensibility of dnlist ADE Form

The dnlist ADE form has protocol specifics built in for BSAP and Fisher ROC but does not allow any extensibility so it is difficult to add "Download by List" functionality to a new protocol (such as DNP3).
Collin Heggerud over 1 year ago in Enterprise SCADA Server / ADE / PnT / MoC / Protocols and Commlines / Telemetry 1 Will not implement

Tollerance factor value change in case the flow meter measured value is out of pre-defined range

Flow meter's accuracy changes when measure value is out of range. Hence, there should be a mechanism to support this feature with-in the application. This can be enabled with logical conditional statements for tolerance value settings. Instead of ...
Kiran Karumuri over 2 years ago in Production Accounting / New features request 0 Planned

Valve equation generation with-in the application as utility

Flow estimation valve equation being generated outside the application and same being configured with-in the application during project implementation stage. Utility with-in the application will not only enables the services and also the customer ...
Kiran Karumuri over 2 years ago in Production Accounting / General 0 Planned

Node Balance report generation with-in APA

Many customers looks at node wise balance report to track the imbalances at micro level to check, review and validate. Manual report configuration and preparation is cumbersome and time taking. Auto generation of node wise report with-in the appli...
Kiran Karumuri over 2 years ago in Production Accounting / Reports 0 Planned