Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Tollerance factor value change in case the flow meter measured value is out of pre-defined range

Flow meter's accuracy changes when measure value is out of range. Hence, there should be a mechanism to support this feature with-in the application. This can be enabled with logical conditional statements for tolerance value settings. Instead of ...
Kiran Karumuri over 3 years ago in Production Accounting / New features request 0 Planned

Valve equation generation with-in the application as utility

Flow estimation valve equation being generated outside the application and same being configured with-in the application during project implementation stage. Utility with-in the application will not only enables the services and also the customer ...
Kiran Karumuri over 3 years ago in Production Accounting / General 0 Planned

Node Balance report generation with-in APA

Many customers looks at node wise balance report to track the imbalances at micro level to check, review and validate. Manual report configuration and preparation is cumbersome and time taking. Auto generation of node wise report with-in the appli...
Kiran Karumuri over 3 years ago in Production Accounting / Reports 0 Planned

Expose timeout setting for P2B integration

[Problem Summary] Customer uses a stored proc in the P2B SelectCommand property to fetch the PI event frames from PI Server. It is normal for the query to run for 2 minutes or longer sometimes. When in this situation, Ampla integration reports tim...
Nina NICHOLLS over 3 years ago in Production Management (AMPLA MES) / Configuration 0 Future consideration

Business Rules in Production Reporting Points

It would be handy if we could utilise row colour coding (Business Rules) in the production module client grid view (as per the current functionality in the Downtime module). Enabling this feature would greatly enhance the power of the grid view in...
Chris MASTERS almost 7 years ago in Production Management (AMPLA MES) / Production 0 Future consideration

Filtering stats based on conditions

When comparing control performance with and without APC, it would be helpful to see separately the average, std,... when APC is on or off based on the value of the controller status tag. The same philosophy could be applied to get statistics only ...
Eduardo Sanchez over 3 years ago in APC / Trends 0 Evaluating

Enhance Datapump to be able to optionally use the FIRE_TRIGGERS option for bulk inserts

We (TCE) would like to find out if Aveva would be able to enhance Datapump to be able to optionally use the FIRE_TRIGGERS option for bulk inserts. We have turned bulk load off for now but would like to see if we could get this enhancement so we co...
Rob Kenny over 3 years ago in Enterprise SCADA Server / Datapump 1 Planned

Evaluate fields when Quality moved forward

Evaluated fields are not calculated when quality is moved forward. This would be an issue for the Material Accounting solution. In the configuration below, Re_SO4 for WorkCenter2 will not be evaluated for a QMF record. (We just need to run the eva...
Priyanka VINAYCHANDER almost 7 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration

Auto selection for multi-column drop down when there is only one option

Sometimes there are situations when I filled out one or several fields and for the remaining fields there is only one possible option. And these values are not put down automatically, you have to input them manually. Is there any way to fix this? ...
Priyanka VINAYCHANDER about 7 years ago in Production Management (AMPLA MES) 0 Future consideration

Enhanced logging for Ampla timers

https://schneiderampla.atlassian.net/browse/CE-1902 [System Info]Ampla 6.0.7022 [Raised by]Customer Company: Rio Tinto Iron OreCustomer Contact: Thejus.jose@riotinto.com [Enhancement Request] Rio Tinto experienced a couple of instances with two se...
Nina NICHOLLS about 7 years ago in Production Management (AMPLA MES) 0 Future consideration