Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 32 of 791

Graphics Builder Goto Object Enhanced Functionality

The Goto Object in the graphics builder is particularly useful when you have grouped objects, but each time you double click to bring up the animation the Goto Object form closes. It would be great if the form could be docked or simply stay open o...
Guest about 2 years ago in Plant SCADA / Graphics / Visualization 1 Unlikely to implement

Graphics Builder draw line from x1,y1 to x2,y2

At the moment if we need to draw a line from a start point x1,y1 to an end point x2,y2 we need to use trigonometry and trickery to rotate/scale a native line or polygon. The "Vertices" tab for a polygon is very close, but you can only manipulate e...
Guest about 2 years ago in Plant SCADA / Graphics / Visualization 1 Unlikely to implement

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Citect Scada Show/Hide Alarm Indicator Border

In Citect 2018 when configuring a genie or a group of objects you can select the "Alarm Indicator" tab from the genie or group configuration dialog and configure the genie or group or objects to use a set of alarm indicating symbols and border. An...
Guest almost 5 years ago in Plant SCADA / Graphics / Visualization 0 Future Consideration

Paste a copied object on the same coordinates as the original object

When pasting a copied object, it would be nice to have the option to paste it at the same coordinates of the copied/original object. Sure, I can note the coordinates using "Adjust Position and Size" and then enter the coordinates on the new obj...
Peter Chung almost 3 years ago in Plant SCADA / Graphics / Visualization 0

Evaluated fields for Material movement items

Material movement items currently do not support evaluated fields. As a part of the Alcoa project, at a certain point in their design, which uses meter marks to capture movements, having evaluated fields on movements would have helped to work out ...
Priyanka VINAYCHANDER over 6 years ago in Production Management (AMPLA MES) / Configuration / Inventory 0 Future consideration

Add evaluated fields for movements

There is different scenarios when an evaluated fields required on a movement. For example when you have online analyzers which give you the estimated grade or moisture and you would like to be able to have the dry tonnes or fine material in the mo...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Improve UseAvailableQuantity

Improve UseAvaiableQuantity behaviour to only do the movement when the balance in not 0. Currently many movements are failing processing because when the movement is triggered there is no balance in the lot group, and since there is no way to chec...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Add balance views over time group by a period

When you look at the balance over time views, you usually need to see how it has been changed by a period, for example what was the balance at the end of each shift for a month. But the current balance over time views shows all the changes to the ...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Movement without specifying LG from a WC with Mandatory LG

Currently if you have a movement from a WC you have to specify the Source LG, otherwise it consider the movement from NULL LG. In reality, in many cases the movement out of a WC requires to move material out of all lot groups in the WC as there is...
Mehrnoosh KHODAVERDY about 5 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration