Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 23 of 776

Define Controller Watchdog Tags

allow them to be selected from a List, avoid the potential for typos and other errors.
Geoff Lewis over 2 years ago in APC / Controller Configuration 0 Evaluating

Define DCS Readback and DCS Status

When defining these tags in a controller, allow them to be selected from a list of all Input Tags, with possibility to apply a filter to limit the size of the presented list. Currently we have to enter the text directly with all kinds of possibili...
Geoff Lewis over 2 years ago in APC / Controller Configuration 0 Evaluating

Convert Raw Tag to Custom

Currently it is possible to convert a Custom Tag to Raw Tag, but not vice versa. This would be v helpful when migrating controllers.
Geoff Lewis over 2 years ago in APC / General 0 Evaluating

Prediction Mode (Open Loop)

Provide a "prediction mode" for the controller where it can read the values from the DCS and predict the steady state values of the CVs but it cannot write back the setpoints to PID controller in DCS. Read-only connectivity to the DCS, moves are c...
Ina Llewellyn almost 3 years ago in APC / Connectivity 1 In development

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Filtering stats based on conditions

When comparing control performance with and without APC, it would be helpful to see separately the average, std,... when APC is on or off based on the value of the controller status tag. The same philosophy could be applied to get statistics only ...
Eduardo Sanchez over 2 years ago in APC / Trends 0 Evaluating

Evaluated fields for Material movement items

Material movement items currently do not support evaluated fields. As a part of the Alcoa project, at a certain point in their design, which uses meter marks to capture movements, having evaluated fields on movements would have helped to work out ...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Configuration / Inventory 0 Future consideration

Add evaluated fields for movements

There is different scenarios when an evaluated fields required on a movement. For example when you have online analyzers which give you the estimated grade or moisture and you would like to be able to have the dry tonnes or fine material in the mo...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Improve UseAvailableQuantity

Improve UseAvaiableQuantity behaviour to only do the movement when the balance in not 0. Currently many movements are failing processing because when the movement is triggered there is no balance in the lot group, and since there is no way to chec...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Add balance views over time group by a period

When you look at the balance over time views, you usually need to see how it has been changed by a period, for example what was the balance at the end of each shift for a month. But the current balance over time views shows all the changes to the ...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration