Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Plant SCADA

Showing 97 of 470

Improvements of the deployment functionality

Deploying a project can be slow, especially upoading a new version of the project. A progression bar with remaining time would be nice. Would be a nice feature if you could upload the complete project including the configuration files. Have an opt...
Guest over 1 year ago in Plant SCADA / Development Tools 3

Native MQTT Client

I think it is usefull to add a native MQTT client to Plant SCADA.
Guest almost 2 years ago in Plant SCADA / API & Connectivity 3 In Roadmap

Copy+Paste items inside Equipment editor

If we need to add an equal or similar item to several equipments we need to type everything, or if we have several tags in the same equipment and want to add an alarm to all of them, it should be useful to copy the alarm part from one item to othe...
Guest about 4 years ago in Plant SCADA / Development Tools / Equipment 1 Future Consideration

Process Analyst in dark mode

A complete dark Mode of the Process Analyst is not possible. Some parts of the PA can’t be changed. There are no properties to change the background and foreground color of the toolbar and object view.
Guest 10 months ago in Plant SCADA / Alarms 2 Future Consideration

Version Control

Citect desperately needs an integrated version control system. I understand that there are third party applications out there (MDT, Version Dogg), but they are not ideal. It would be great if the application could wrap around Git or SVN. And an ab...
Guest over 2 years ago in Plant SCADA / Other 1 In Development

Enlarge the tables in the kernel

For instance the CSAToPSI.Subs, it starts with the cluster name, then the tag, which can 79 characters. You can only see 29 characters. Also in a kernel dump the length is limited. Also sorting on different colums would be helpfull.
Guest about 1 year ago in Plant SCADA / Kernel & Diagnostics 0

Edit Equipment types with a table tool like Excel

when it is needed to update a lot (not all) of variable and trend definitions for example Historian = true within an equipment type. Browsing to the item, opening the definition, add the field and set the value to true will take a lot of time. Whe...
Guest over 1 year ago in Plant SCADA / Equipment 1 Unlikely to implement

Grace period HW alarm

It would be great to get a HW alarm when a license is entering a grace period. It is not every day that you log into the AEL and check the status. Furthermore, it has happened that someone has moved a VM instance to another machine without knowing...
Peter Chung about 1 year ago in Plant SCADA / Alarms 1 Future Consideration

Upgrade the MAXIMUM LENGHT for STRING and CITECT.INI Parameters over 254 characters !

As discussed in TN000028481 , the MAXIMUM LENGHT for STRING and CITECT.INI Parameters is 254 characters ! This cause many problems inside CICODE SCRIPTS (this limit is too strong in modern world!) and in [Event] parts of citect.ini (you must reduc...
Guest about 1 year ago in Plant SCADA / Development Tools 0

Trend history file modification

Currently any change to a trend in Citect means having to discard the trend history files, for example changing the Sample Period. Would it be possible to have Citect modify the history files automatically? There are tools in the Toolbox to achiev...
Guest about 4 years ago in Plant SCADA / Alarms 1 Future Consideration