Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 241 of 776

Call Excel Addin functions from vba

Whe have our own Excel macro's for generating tags, alarm, trends, etc and would like to use the 64bit version of Excel. We want to open a DBF using the Excel Addin, run our own macro and then save the DBF file using vba.
Guest over 1 year ago in Plant SCADA / Development Tools 1 Future Consideration

Process Analyst in dark mode

A complete dark Mode of the Process Analyst is not possible. Some parts of the PA can’t be changed. There are no properties to change the background and foreground color of the toolbar and object view.
Guest over 2 years ago in Plant SCADA / Alarms 2 Future Consideration

Search and replace inside Equipment Editor

When we have diferent equipments with same comun branch and need to change them all, its a lot of work, because we need t go to each equipment open it search the item, open it and change.
Guest over 5 years ago in Plant SCADA / Development Tools / Equipment 0 Future Consideration

Enhance the OPC UA server browsing feature in AVEVA Plant SCADA to allow batch selection and import of multiple tags simultaneously, improving efficiency for users handling large tag sets

The current OPC UA server browsing feature in AVEVA Plant SCADA only allows users to browse and import tags one by one. This process is not feasible when dealing with large systems containing thousands of tags, as it significantly increases the ti...
Guest about 1 year ago in Plant SCADA / Drivers / Protocols 0 In Roadmap

Add 64-bit INT to Modbus Driver

Device manufacturers (especially Schneider) are increasingly using 64-bit integers for data. The present Modbus TCP driver does not support 64-bit INT so integration of these devices results in unsatisfactory limits on data. The Modbus driver need...
Guest over 2 years ago in Plant SCADA / Drivers / Protocols 1

SPS version 11 support for RTUPlayer and Trainer.

Requesting support for SPS 11.1 and Windows Server 2022 operating system for RTU Player and Trainer applications.
Andrew Potkins 2 months ago in Enterprise SCADA Server / Applications 0

Allow the "safety string" to be moved or disabled in the alarm message

Currently in baseline, (SAFETY) is always added as a prefix to Safety Related alarm messages. It is used as the marker whether the alarm should be recorded in the event table as safety-related. Our customer wants to have (SAFETY) as a suffix for t...
Hugh Arai 2 months ago in Enterprise SCADA Server / Alarms 0

Alarm Page and Historical SOE list with Time filter

We are getting complaints from customer that the Alarm Page and Historical SOE do not have to capability to filter lists on Time. This case has been discussed in the Community . And there has been several feedbacks form the Community to AVEVA on t...
Guest about 4 years ago in Plant SCADA / Historic Data / Storage 2

Omnicomm should better support modern network speeds

Omnicomm has a feature that allows it to wait longer for large messages than for short messages. This feature defaults to calculations based on messages transmitted at 1200bps and has a maximum configurable rate of 38400bps. In a world where many ...
Collin Heggerud 2 months ago in Enterprise SCADA Server / Omnicomm 0

Omnicomm retries on temporary connections should retry the connection

On Tech Support case 962469169 it became very clear that when the socket of a temporary connection was broken, Omnicomm would not re-attempt the connection until the next scheduled poll interval (e.g., 5 minutes later). I would expect that if Omni...
Collin Heggerud 2 months ago in Enterprise SCADA Server / Omnicomm / Protocols and Commlines 0