Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 774 of 774

Citect Scada Show/Hide Alarm Indicator Border

In Citect 2018 when configuring a genie or a group of objects you can select the "Alarm Indicator" tab from the genie or group configuration dialog and configure the genie or group or objects to use a set of alarm indicating symbols and border. An...
Guest almost 5 years ago in Plant SCADA / Graphics / Visualization 0 Future Consideration

User alarm limits should obey existing alarm deadbanding configuration

After configuring user alarms using the “user hi” and “user lo” functionality, alarms are being generated without consideration for the alarm level deadband configured for the point. For example: A user high alarm configured at 100 will ring into ...
Guest over 2 years ago in Enterprise SCADA Server / Alarms 0 Reviewing

Multiple transient state support for multistate command

Detailed Description Due to various physical factors, sometimes a 2-bit status point will transition through both the (valid) TRANSIT state as well as the (invalid) ERROR state, on its way from CLOSED to OPEN (or vice versa). This enhancement will...
Guest over 2 years ago in Enterprise SCADA Server / Alarms / Krunch and Data Manipulation 0 Reviewing

User alarm limits should obey existing alarm deadbanding configuration

Big Picture User Experience User alarm limits should obey existing alarm deadbanding configuration Detailed Description After configuring user alarms using the “user hi” and “user lo” functionality, alarms are being generated without consideration...
Guest over 2 years ago in Enterprise SCADA Server 0 Reviewing

Tollerance factor value change in case the flow meter measured value is out of pre-defined range

Flow meter's accuracy changes when measure value is out of range. Hence, there should be a mechanism to support this feature with-in the application. This can be enabled with logical conditional statements for tolerance value settings. Instead of ...
Kiran Karumuri over 2 years ago in Production Accounting / New features request 0 Planned

Valve equation generation with-in the application as utility

Flow estimation valve equation being generated outside the application and same being configured with-in the application during project implementation stage. Utility with-in the application will not only enables the services and also the customer ...
Kiran Karumuri over 2 years ago in Production Accounting / General 0 Planned

Node Balance report generation with-in APA

Many customers looks at node wise balance report to track the imbalances at micro level to check, review and validate. Manual report configuration and preparation is cumbersome and time taking. Auto generation of node wise report with-in the appli...
Kiran Karumuri over 2 years ago in Production Accounting / Reports 0 Planned

Process Analyst Static Background

The process analyst does not currently allow for the layering of static imagine behind a trend. A customer would like to have the ability to set a background, similar to how regular trends in Citect SCADA operate. I believe this is currently not i...
Guest almost 5 years ago in Plant SCADA / Alarms 0 Future Consideration

Expose timeout setting for P2B integration

[Problem Summary] Customer uses a stored proc in the P2B SelectCommand property to fetch the PI event frames from PI Server. It is normal for the query to run for 2 minutes or longer sometimes. When in this situation, Ampla integration reports tim...
Nina NICHOLLS over 2 years ago in Production Management (AMPLA MES) / Configuration 0 Future consideration

Equipment editor always show with all elements expanded

If you select an Equipment, you have allways to open the expander vor parameters seperatly. So the comparing of instances of Equipment is slow. The same with EquipmentTypes. To Compare Items, you have allways to expand each Subitem by clicking
Guest over 2 years ago in Plant SCADA / Development Tools 0