Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 544 of 544

OSM Improvement Proposal - Additional column with titles in CoW on last used + adjust the number last displayed

"Additional column with titles in CoW on last used. as well as the ability to adjust the number of last ones displayed in the menu. Made a bad drawing with "additional columns" added as an attachment."
Ashutosh Dubey over 1 year ago in Operational Safety Management / Dashboards / Reporting 1 Already exists

OSM Improvement Proposal - Being able to link freely chosen ILs into an IP without having to create them from the IP

We would like to be able to link IL lists into IP afterwards without having to create IL from the IP. When I am going to reuse IL lists today, I have to copy a complete IP. I would like to take a list from one IP and another list from another IP. ...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement Proposal - Could indicate that tag is referenced on other open IP/IL

Found on Aveva's backlog but should also be recorded from Aker BP
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement proposal - Isolated safety equipment and compensatory measures

"Description: Be able to inherit this on the IL and override. Requirements. If it is set up on the IP that safety equipment is isolated, at least 1 IL must be unhooked. If it is set up on the IP that safety equipment is NOT isolated, no IL can be ...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement proposal - IL number on all pages of the printed insulation list

When insulation lists are printed, they come across several pages. Then it can quickly become a mess about which insulation points belong to which insulation list. Will have the IL number at the top of all pages of the insulation list when it is p...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 0 No status

OSM Improvement proposal - AT form: Phrases on identified risks

"Identified risk on the work permit Fixed phrases based on the subtype selected on the AT form which are inserted as proposals in the identified risk that can be changed."
Ashutosh Dubey over 1 year ago in Operational Safety Management / Work Permits 1 Already exists

OSM Improvement Proposal - Change width of "Name" and "Description" in "Extreme SAC"

"User requested priority of P3 Medium. When you create a Shield-WP and search for an application under "External SAC" the field below is too narrow. So we want "Name" to be changed to be able to display the name of a typical application (do a sear...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Work Permits 1 Already exists

OSM Improvement proposal - More predefined colors in the drawing tool

"Several predefined colors in the drawing tool when coloring with e.g. yellow and orange. When coloring isolated lines with e.g. yellow and orange, you want it to be transparent so you can see what's underneath. We want it to be predefined as it i...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Administration 1 Already exists

OSM Improvement proposal - IL recommenation to AT based on the IP linked to the AO on which the AT is based

Have linked the wrong IL to WP several times, it happened last today that it was unnecessary to have to run things through the approval process for Level 1 again, so when we are going to link IL to WP it would have been fine to have a ready defaul...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement proposal - Improvement of date setting IP/IL

"It seems that the dating of IP/IL in COW is most often not actively used. This is stupid and means that you have poorer control and overview than necessary. Work is being done with other digital tools that will happen data flow from COW which dep...
Ashutosh Dubey over 1 year ago in Operational Safety Management / Safe Job Analysis 1 Already exists