Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Enterprise SCADA Server

Showing 116 of 775

IEC-104

IEC60870-101 or IEC60870-104 are the serial and IP versions of what is sometimes refered to IEC-104. These are both part of the IEC60870-5 standard, whereas ICCP is IEC60870-6, and is different. IEC_62351 is a standard for securing the various pro...
Josie Liu over 5 years ago in Enterprise SCADA Server / Omnicomm / Protocols and Commlines / Telemetry 0 Reviewing

ADE permit to use symbols (),.-/

On ADE, Address1 and Address2 fields in the Station table of ADE do not permit the use of symbols such as (),.-/, even though these characters can be part of legitimate addresses.
Gerald Tseng over 1 year ago in Enterprise SCADA Server / ADE / PnT / MoC 0

Enhancements to use Device DataQuality: uncertain and error

We request enhancements to the ability for a protocol to indicate data quality to the krunch routines, as first requested in OASYS-518 (API for Protocols to indicate data to be krunched is questionable according to field device): https://aveva.aha...
Collin Heggerud over 1 year ago in Enterprise SCADA Server / Krunch and Data Manipulation / Realtime API/SDK 0

Allow protocol specific extensibility of dnlist ADE Form

The dnlist ADE form has protocol specifics built in for BSAP and Fisher ROC but does not allow any extensibility so it is difficult to add "Download by List" functionality to a new protocol (such as DNP3).
Collin Heggerud over 1 year ago in Enterprise SCADA Server / ADE / PnT / MoC / Protocols and Commlines / Telemetry 1 Will not implement

[National Fuel Gas Supply] Add Calendar Popup to Timed Inhibit Display

Customer asking if it would be possible to add a calendar popup that could be used to set the inhibit duration. This is likely something that other customers have requested in the past and may already have been implemented in other projects – if n...
Serge LeBlanc over 1 year ago in Enterprise SCADA Server 0

Parent control alarm suppression for ROC alarms

The Chevron 2022 SP1 project is requesting the ability to use Parent control alarm suppression to suppress ROC alarms
Hugh Arai over 1 year ago in Enterprise SCADA Server / Alarms 0

Enhance Omnicomm to make it easier for protocols to work with sub-remote status indicator.

An enhancement for protocol developers that is standard for all protocols.

Testing as a Service

Multiple customers have offered to share their test scripts with us to improve our ability to test usage that better matches customer environments.

Allow customers to latch alarms

Here is one problem customers are encountering with our alarming philosophy, where we replace the existing alarm with a new one with the current alarm state: Because the alarm for exceeding hi-hi isn’t latched, operators are missing that MAOP was ...
Collin Heggerud over 5 years ago in Enterprise SCADA Server / Alarms / Control Room Management 0

Collect doesn't collect current real-time value at top of hour

Customer Requirement Our customers require the ability to maintain complete Timeseries historical trends (collect samples), including timestamped samples polled after a PLC communication loss (outage could be for several hours/days). The customer ...
Guest almost 4 years ago in Enterprise SCADA Server / Historical / Realtime 2 Waiting for information