Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Plant SCADA

Showing 103

Export of the alarm list at Runtime on SA Projects

The export of the alarm list is not present in projects created with the SA template (it was present in old SxW_Style projects). The implementation of an export command requires the inclusion of the Tab_Style_Include project and the use of compone...
Guest about 4 hours ago in Plant SCADA / Alarms 0 Submitted

Remove more than 1 version in the deployment server at a time

It would be highly beneficial to introduce the capability to remove multiple versions simultaneously. Additionally, an automated feature to retain only the latest 10 versions.
Peter Chung 5 months ago in Plant SCADA / Other 0

Enhance the OPC UA server browsing feature in AVEVA Plant SCADA to allow batch selection and import of multiple tags simultaneously, improving efficiency for users handling large tag sets

The current OPC UA server browsing feature in AVEVA Plant SCADA only allows users to browse and import tags one by one. This process is not feasible when dealing with large systems containing thousands of tags, as it significantly increases the ti...
Guest about 2 months ago in Plant SCADA / Drivers / Protocols 0 In Roadmap

The SA include treeview control does not have the ability to change the order of the elements in a leaf.

It would be useful to change the order so that the tree can reflect the logical order of the process plant however that looks, for example the flow of material or process vs ancillary equipment or whatever rather than just alphabetically.
Guest about 1 month ago in Plant SCADA / Equipment 0

Remove the Need for pg* Files

Eliminate the requirement for pg*.dbf files. These files are not really needed as the same info is in the .ctg files. These files make it difficult to use PlantSCADA with version control, such as SVN or git since either these files need to be vers...
Guest over 2 years ago in Plant SCADA / Graphics / Visualization 1

OPCUA Variable Import limited to 79 characters

When you import Variable Tags from an OPCUA Server the tag names are truncated to 79 characters, this is sometime not enough. Duplicate tagnames are not allowed. You have to manually adjust all the names. For instance when you connect to a Plant S...
Guest about 1 year ago in Plant SCADA / Drivers / Protocols 1

Search option at Run-time

Search-function similar to what we have in Citect-Studio, but at Runtime. Would be nice to be able to search for a specific tag in order to find which mimic it is used in. Should be possible to click in the search-result and jump directly to the s...
Guest about 1 year ago in Plant SCADA / Other 0 Future Consideration

Unify automatic generation of Configuration Parameters in Plant SCADA Studio 2023 and Equipment Editor

Currently when adding new Equipment through Equipment Editor, all relevant Configuration Parameters will be generated automatically and are available in Plant SCADA Studio 2023. However if you add a new Equipment in Plant SCADA Studio and run "Upd...
Guest almost 2 years ago in Plant SCADA / Equipment 1

Native MQTT Client

I think it is usefull to add a native MQTT client to Plant SCADA.
Guest over 2 years ago in Plant SCADA / API & Connectivity 4 In Roadmap

Improvements of the deployment functionality

Deploying a project can be slow, especially upoading a new version of the project. A progression bar with remaining time would be nice. Would be a nice feature if you could upload the complete project including the configuration files. Have an opt...
Guest almost 2 years ago in Plant SCADA / Development Tools 3