• Add ability to control the time frame that the quick complete values are calculated for
  • Ampla Health/Performance Reporting
  • Ampla to support Industry 4.0
  • Access to Ampla Downtime Configuration via webservices
  • Update Duration for manual downtimes
  • Allow downtime records to be saved after clearing the end time value
  • Capture Operator
  • Please add TimeWeightedAverage/Average Variable to the items
  • Material Quality line chart should not accumulate field values with the same sample period together
  • KPI targets based on calendar loopkup should look at target for each sub period