Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 30 of 791

Prevent blocked installer from starting

One major cause of issues we see often which causes a lot of work is caused by iso/zip which where not unblocked.Typically it causes different issues and then we have to redo the installations Question : can we please put some effort into checking...
Erik van de Wetering 10 months ago in Application Server / Installation 5 Planned

OS-Configuration Utility needs an option to not overwrite existing Firewall rules during upgrades.

We are using System Platform 2023----After our normal installation and hardening, we have 22 firewall rules on the system. After installing the SP, (with OS-Configuration Utility) we suddenly have 245 rules. See attachment for details. Requirement...
Guest about 1 year ago in Application Server / Configuration / Installation / Security 1

Check Computername validity before commencing installation

Check that the computername does not include an "_" or exceed the NetBIOS limit of 15 characters before continuing with installation.
Ernst Van Wyk about 1 year ago in Application Server / Installation 0

Improve calculation for availability for long running downtime record

In the customer project, there has been a long running downtime. For the metrics records, during the current shift period, the availability which should be 0 (since there is an active long downtime record) shows a value greater than 0. After the p...
Nina NICHOLLS about 1 year ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

Allow adjustment of quality balance

The problem customer is facing is mismatching Quality Balance with Lot Group Balance. They would like to reset a given lot group such that Quality Balance = Lot Group Balance. Quality survey is not an option as it simply set the quality of the who...
Nina NICHOLLS over 1 year ago in Production Management (AMPLA MES) / Inventory / Material Quality 0 Future consideration

Update Duration for manual downtimes

In Ampla, duration is automatically updated only for open downtimes captured by Ampla (automatic). Manual open downtime durations are not updated automatically. Usually, a code item has to be written to update the duration of manual downtimes. Ref...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

BalanceByLotGroupAtPointInTime

We need a way to get the inventory data at a point in time. Can we have a sample period filter that sets for a point in time and this would be applied to the Balance, Balance by lot/lot group views. Currently the only work around is to select Over...
Kyriacous SAMATA over 6 years ago in Production Management (AMPLA MES) / Client / Inventory 0 Future consideration

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Evaluate fields when Quality moved forward

Evaluated fields are not calculated when quality is moved forward. This would be an issue for the Material Accounting solution. In the configuration below, Re_SO4 for WorkCenter2 will not be evaluated for a QMF record. (We just need to run the eva...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration

Evaluated fields for Material movement items

Material movement items currently do not support evaluated fields. As a part of the Alcoa project, at a certain point in their design, which uses meter marks to capture movements, having evaluated fields on movements would have helped to work out ...
Priyanka VINAYCHANDER over 6 years ago in Production Management (AMPLA MES) / Configuration / Inventory 0 Future consideration