Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 74 of 776

Enhancements to use Device DataQuality: uncertain and error

We request enhancements to the ability for a protocol to indicate data quality to the krunch routines, as first requested in OASYS-518 (API for Protocols to indicate data to be krunched is questionable according to field device): https://aveva.aha...
Collin Heggerud over 1 year ago in Enterprise SCADA Server / Krunch and Data Manipulation / Realtime API/SDK 0

Enhance Omnicomm to make it easier for protocols to work with sub-remote status indicator.

An enhancement for protocol developers that is standard for all protocols.

Multiple transient state support for multistate command

Detailed Description Due to various physical factors, sometimes a 2-bit status point will transition through both the (valid) TRANSIT state as well as the (invalid) ERROR state, on its way from CLOSED to OPEN (or vice versa). This enhancement will...
Guest over 2 years ago in Enterprise SCADA Server / Alarms / Krunch and Data Manipulation 0 Reviewing

OSM Improvement proposal - Button to report errors on drawings/ P&IDs

"Sometimes when you make insulation plans, drawings appear with errors that cannot be marked or have other bugs. How about a button in the same image that you can report errors on P&IDs directly to those working on it? Because quite frankly wh...
Ashutosh Dubey over 2 years ago in Operational Safety Management / Administration 1 Already exists

Y2K38 Preparedness

Big Picture User Experience The Year 2038 problem (also known as Y2038, or Y2K38, or the ‘Epochalypse’) is a time datatype bug involving the use a signed 32-bit integer to store of Unix time. The data type is only capable of representing integers ...

Request for year to be added to the runtime structure

We've previously added an additional "year" field to the runtime structure to track hours per year for a 7.5 project. I'd like to request an enhancement to OASyS 2021 to add "year" to the runtime structure please. I see that there's a runtimeyear....
Natalie Hunter almost 4 years ago in Enterprise SCADA Server / Krunch and Data Manipulation / Realtime Schema 5 Will not implement

Offline Rate Integration

Customers on 7.5 system often had a small change made to vdb_rate.cpp, allowing integration to continue even when a point was not fresh, using its last good rate value. This allows calculated volume integrations to match more closely with what oth...
Jake Hawkes almost 5 years ago in Enterprise SCADA Server / Krunch and Data Manipulation 0 Future consideration

OSM Improvement proposal - Operator areas into CoW as fixed fields folder into area codes

User requested priority of P2 High could enter a new information element on isolations (IP IL) between location and area codes such as here operator areas. This should be searchable on IP and IL. Each operator area consists of a set of area codes
Ashutosh Dubey about 3 years ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement proposal - P&ID printing on IP

Hello, when we have large isolation plans that go over many P&IDs, there will sometimes be P&IDs without an isolation point but which are nevertheless included in the isolation segment. sometimes we have also written important information ...
Ashutosh Dubey about 3 years ago in Operational Safety Management / Equipment Isolations 1 Already exists

OSM Improvement proposal - Printing of IP and IL

"Previously, you had the option to stand in IP and press "print" and check that you wanted to print the IL list with the isolation points and P&ID in addition. This option has now been removed and to print the IP with associated documents you ...
Ashutosh Dubey about 3 years ago in Operational Safety Management / Dashboards / Reporting 1 Already exists