Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 7 of 776

Request for a new telemetered point type/table

SE PA WWW integrator has industry specific telemetered point type of Water Reservoir. Reservoirs are a type of telemetered point similar to an analog but with additional calculations for volume etc. Prior to binary release integrator modified the ...
Guest almost 4 years ago in Enterprise SCADA Server / Realtime API/SDK / Realtime Schema / Telemetry 1

Expansion of point description field string length

SE PA WWW previously modified database schema and structure now with binary release modifications tot he database structure are limited. Support for modifying existing types including changing string length is not supported. SE PA WWW typically...
Guest almost 4 years ago in Enterprise SCADA Server / Realtime Schema 3 Will not implement

Tollerance factor value change in case the flow meter measured value is out of pre-defined range

Flow meter's accuracy changes when measure value is out of range. Hence, there should be a mechanism to support this feature with-in the application. This can be enabled with logical conditional statements for tolerance value settings. Instead of ...
Kiran Karumuri over 2 years ago in Production Accounting / New features request 0 Planned

Valve equation generation with-in the application as utility

Flow estimation valve equation being generated outside the application and same being configured with-in the application during project implementation stage. Utility with-in the application will not only enables the services and also the customer ...
Kiran Karumuri over 2 years ago in Production Accounting / General 0 Planned

Node Balance report generation with-in APA

Many customers looks at node wise balance report to track the imbalances at micro level to check, review and validate. Manual report configuration and preparation is cumbersome and time taking. Auto generation of node wise report with-in the appli...
Kiran Karumuri over 2 years ago in Production Accounting / Reports 0 Planned

Request for year to be added to the runtime structure

We've previously added an additional "year" field to the runtime structure to track hours per year for a 7.5 project. I'd like to request an enhancement to OASyS 2021 to add "year" to the runtime structure please. I see that there's a runtimeyear....
Natalie Hunter almost 4 years ago in Enterprise SCADA Server / Krunch and Data Manipulation / Realtime Schema 5 Will not implement

Ability to add new fields to almsum/event tables in ES2021

One of our water projects will be upgrading to 2021 (or 2022) from 7.5. They've previously customized their almsum and event tables to include an additional field (a record name from a custom table). I know that we can add fields to Realtime table...
Natalie Hunter almost 4 years ago in Enterprise SCADA Server / Alarms / Realtime Schema 2 Waiting for information