Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 33 of 791

Evaluated fields for Material movement items

Material movement items currently do not support evaluated fields. As a part of the Alcoa project, at a certain point in their design, which uses meter marks to capture movements, having evaluated fields on movements would have helped to work out ...
Priyanka VINAYCHANDER over 6 years ago in Production Management (AMPLA MES) / Configuration / Inventory 0 Future consideration

Metrics copy/paste

If you copy/ paste a Metrics reporting point, a KPI with resolver hooked to a KPI in the same reporting point should be updated to look at the new reporting point not the original one as it is currently.
Mehrnoosh KHODAVERDY almost 7 years ago in Production Management (AMPLA MES) / Configuration / Metrics 0 Future consideration

Allow planning module to be used in metrics KPI resolver

https://dev.azure.com/AVEVA-VSTS/Issue%20Management%20System/_workitems/edit/1877803 Allow planning module to be selected by metrics KPI resolver
Nina NICHOLLS over 3 years ago in Production Management (AMPLA MES) / Metrics 0 Future consideration

Use destination material property should display fields from the destination

Requested by BHP Chile Currently today when we set the use destination quality field if the field is present at the source then we display the destination value if the field is only present at the destination but not the source we do not see the f...
Nina NICHOLLS over 3 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration

Request for year to be added to the runtime structure

We've previously added an additional "year" field to the runtime structure to track hours per year for a 7.5 project. I'd like to request an enhancement to OASyS 2021 to add "year" to the runtime structure please. I see that there's a runtimeyear....
Natalie Hunter almost 4 years ago in Enterprise SCADA Server / Krunch and Data Manipulation / Realtime Schema 5 Will not implement

Add evaluated fields for knowledge RP

Currently evaluated fields don't exist for Knowledge RP, however they are very handy as they are many cases some simple calculations are required in the shift log:An example raised by Naga for Clermont:In the Shift Log they have some numeric info(...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Knowledge 0 Future consideration

Add evaluated fields for movements

There is different scenarios when an evaluated fields required on a movement. For example when you have online analyzers which give you the estimated grade or moisture and you would like to be able to have the dry tonnes or fine material in the mo...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Improve UseAvailableQuantity

Improve UseAvaiableQuantity behaviour to only do the movement when the balance in not 0. Currently many movements are failing processing because when the movement is triggered there is no balance in the lot group, and since there is no way to chec...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Add balance views over time group by a period

When you look at the balance over time views, you usually need to see how it has been changed by a period, for example what was the balance at the end of each shift for a month. But the current balance over time views shows all the changes to the ...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 0 Future consideration

Offline Rate Integration

Customers on 7.5 system often had a small change made to vdb_rate.cpp, allowing integration to continue even when a point was not fresh, using its last good rate value. This allows calculated volume integrations to match more closely with what oth...
Jake Hawkes almost 5 years ago in Enterprise SCADA Server / Krunch and Data Manipulation 0 Future consideration