Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 33 of 791

Improve calculation for availability for long running downtime record

In the customer project, there has been a long running downtime. For the metrics records, during the current shift period, the availability which should be 0 (since there is an active long downtime record) shows a value greater than 0. After the p...
Nina NICHOLLS about 1 year ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

Allow adjustment of quality balance

The problem customer is facing is mismatching Quality Balance with Lot Group Balance. They would like to reset a given lot group such that Quality Balance = Lot Group Balance. Quality survey is not an option as it simply set the quality of the who...
Nina NICHOLLS over 1 year ago in Production Management (AMPLA MES) / Inventory / Material Quality 0 Future consideration

Update Duration for manual downtimes

In Ampla, duration is automatically updated only for open downtimes captured by Ampla (automatic). Manual open downtime durations are not updated automatically. Usually, a code item has to be written to update the duration of manual downtimes. Ref...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Downtime 0 Future consideration

BalanceByLotGroupAtPointInTime

We need a way to get the inventory data at a point in time. Can we have a sample period filter that sets for a point in time and this would be applied to the Balance, Balance by lot/lot group views. Currently the only work around is to select Over...
Kyriacous SAMATA over 6 years ago in Production Management (AMPLA MES) / Client / Inventory 0 Future consideration

Enhancements to use Device DataQuality: uncertain and error

We request enhancements to the ability for a protocol to indicate data quality to the krunch routines, as first requested in OASYS-518 (API for Protocols to indicate data to be krunched is questionable according to field device): https://aveva.aha...
Collin Heggerud over 1 year ago in Enterprise SCADA Server / Krunch and Data Manipulation / Realtime API/SDK 0

Enhance Omnicomm to make it easier for protocols to work with sub-remote status indicator.

An enhancement for protocol developers that is standard for all protocols.

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY over 4 years ago in Production Management (AMPLA MES) / Inventory 1 Future consideration

Multiple transient state support for multistate command

Detailed Description Due to various physical factors, sometimes a 2-bit status point will transition through both the (valid) TRANSIT state as well as the (invalid) ERROR state, on its way from CLOSED to OPEN (or vice versa). This enhancement will...
Guest over 2 years ago in Enterprise SCADA Server / Alarms / Krunch and Data Manipulation 2 Reviewing

Y2K38 Preparedness

Big Picture User Experience The Year 2038 problem (also known as Y2038, or Y2K38, or the ‘Epochalypse’) is a time datatype bug involving the use a signed 32-bit integer to store of Unix time. The data type is only capable of representing integers ...
Jake Hawkes almost 3 years ago in Enterprise SCADA Server / Architecture / Krunch and Data Manipulation / Protocols and Commlines / Realtime / Realtime API/SDK 0 Reviewing

Evaluate fields when Quality moved forward

Evaluated fields are not calculated when quality is moved forward. This would be an issue for the Material Accounting solution. In the configuration below, Re_SO4 for WorkCenter2 will not be evaluated for a QMF record. (We just need to run the eva...
Priyanka VINAYCHANDER about 6 years ago in Production Management (AMPLA MES) / Material Quality 0 Future consideration