Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Ideas

Showing 24 of 776

Multi-system support for HMI

User Story As a pipeline operator / supervisor monitoring pipeline assets that span multiple RealTime environments, I would like to be able to connect my HMI to the combined multi-RealTime environment, conferring all benefit of functionality co...
Tyson Burr over 4 years ago in Enterprise SCADA Server / Architecture / Control Room Management 1 Future consideration

Enhance Device Rollup to support subdevices from multiple datasets

Big Picture User Experience Enhance device rollup from subdevices (telemetered and device object) that belong to datasets that differ from the parent device (top-level device) object dataset. Background With large systems it is now very common to ...
Guest over 2 years ago in Enterprise SCADA Server / Alarms / Control Room Management 0 Reviewing

User alarm limits should obey existing alarm deadbanding configuration

After configuring user alarms using the “user hi” and “user lo” functionality, alarms are being generated without consideration for the alarm level deadband configured for the point. For example: A user high alarm configured at 100 will ring into ...
Guest over 2 years ago in Enterprise SCADA Server / Alarms 0 Reviewing

Multiple transient state support for multistate command

Detailed Description Due to various physical factors, sometimes a 2-bit status point will transition through both the (valid) TRANSIT state as well as the (invalid) ERROR state, on its way from CLOSED to OPEN (or vice versa). This enhancement will...
Guest over 2 years ago in Enterprise SCADA Server / Alarms / Krunch and Data Manipulation 0 Reviewing

Tollerance factor value change in case the flow meter measured value is out of pre-defined range

Flow meter's accuracy changes when measure value is out of range. Hence, there should be a mechanism to support this feature with-in the application. This can be enabled with logical conditional statements for tolerance value settings. Instead of ...
Kiran Karumuri over 2 years ago in Production Accounting / New features request 0 Planned

Valve equation generation with-in the application as utility

Flow estimation valve equation being generated outside the application and same being configured with-in the application during project implementation stage. Utility with-in the application will not only enables the services and also the customer ...
Kiran Karumuri over 2 years ago in Production Accounting / General 0 Planned

Node Balance report generation with-in APA

Many customers looks at node wise balance report to track the imbalances at micro level to check, review and validate. Manual report configuration and preparation is cumbersome and time taking. Auto generation of node wise report with-in the appli...
Kiran Karumuri over 2 years ago in Production Accounting / Reports 0 Planned

Ability to add new fields to almsum/event tables in ES2021

One of our water projects will be upgrading to 2021 (or 2022) from 7.5. They've previously customized their almsum and event tables to include an additional field (a record name from a custom table). I know that we can add fields to Realtime table...
Natalie Hunter almost 4 years ago in Enterprise SCADA Server / Alarms / Realtime Schema 2 Waiting for information

Capture the desired precision for analogs in the backend for use by the HMI

Big Picture User Experience Customers desire to configure the number of decimal places used when displaying floating point numbers on the alarm summary only. Detailed Description The current workaround is to use the internationalisation feature to...
Jake Hawkes almost 5 years ago in Enterprise SCADA Server / Control Room Management 1 Will not implement

Ability to filter out parked alarms from alarm summary screen

Big Picture User Experience TransGas would like to have the ability to hide parked alarms from the alarm summary display. They use alarm parking extensively and feel that having the parked alarms shown on the display makes it more difficult for th...
Todd Cherry almost 5 years ago in Enterprise SCADA Server / Alarms / Control Room Management / Realtime API/SDK 1 Will not implement