Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

All ideas

Showing 507

prescriptive actions as task list

Prescriptive actions are very relevant and frequently hard to read as displayed in 2 row text field. It would be great if this can be displayed as a clear task list with the possibility to expose also on APIs so it can be leveraged by other soluti...
Luca Bruni over 1 year ago in Predictive Analytics / Web Monitoring Client 1 Planned

Cluster field when adding a pen to the process analyst should be a pull-down menu

When adding a pen to the process analyst, it would be great if the cluster field was a pull down with the available clusters listed from the project. With multi-cluster projects, this would help filter out the trend tag lists, as the end-user does...
Guest over 4 years ago in Plant SCADA / Alarms 0 Future Consideration

Allow customers to latch alarms

Here is one problem customers are encountering with our alarming philosophy, where we replace the existing alarm with a new one with the current alarm state: Because the alarm for exceeding hi-hi isn’t latched, operators are missing that MAOP was ...
Collin Heggerud over 4 years ago in Enterprise SCADA Server / Alarms / Control Room Management 0

Create lots and lot groups with surveys

Currently only a movement in/out of a lot/lotgroup will create a new lot/lotgroup. However there are many scenarios when a new lot/lotgroup will be introduced into the system using a survey event.BHP Chile has this scenario when start blasting a n...
Mehrnoosh KHODAVERDY about 3 years ago in Production Management (AMPLA MES) 1 Future consideration

Mechanism for clearing cause location filter when switching navigation mode to location

[Problem Summary]Downtime reporting point navigation allows user to choose either Location or Cause location to view downtime records. However, when switch from location to cause location, the filter is automatically populated current Location sel...
Nina NICHOLLS almost 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Expose Ampla Configuration

https://schneiderampla.atlassian.net/browse/CE-1916 [Raised by]Customer Company: Rio TintoCustomer Contact: Ben Jones (Ben.Jones@RioTinto.com) [Enhancement Request]Rio Tinto Iron Ore's ORDW team (Operational Datawarehouse) team requires access to ...
Matthew GRAHAM almost 5 years ago in Production Management (AMPLA MES) 0 Future consideration

Tag Labels

From Jon Tomkins. Following up on an old enhancement request from the Aussies on ISM. It may not be seen as high priority but wanted to flag a pain point for implementation – when we are attempting configuration management of compositions, as toda...
Andy Davidson over 1 year ago in Information Standards Manager 0

Required Version label is confusing

From Jon Tonkins: If a version is set to something like 1.0.2.*, understand this actually means ‘use latest version’. This reads confusingly as it looks like it should only be 1.0.2.something but can then be 1.0.3, etc.
Andy Davidson over 1 year ago in Information Standards Manager 0

Make the diagnostic webservice public

[Problem Summary] Customer has been using the GetActiveSessions method in the Diagnostics web service through HTTP in 6.5. Most Ampla web service end points are available through both HTTP and NET.TCP. However, since their upgrade to 8.1, they hav...
Nina NICHOLLS over 1 year ago in Production Management (AMPLA MES) 0 Future consideration

Include relevant standard fields to work centers so they can have different names based on the location

Lot and Lot groups are concepts which don't have a meaning for customers but usually have a definition for them for each specific work center. For example in stock yard usually the Lot group is the stockpile name. Or in Cathode yard the cathode pa...
Mehrnoosh KHODAVERDY over 3 years ago in Production Management (AMPLA MES) 1 Will not implement