Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Enterprise SCADA Server

Showing 68

Alarms should update group when the related point changes group

When a point generates an alarm, the alarm gets the same AOR Group as the point, and based on the AOR Group users can or cannot see the alarm and acknowledge it. But if after the alarm is generated the responsibility group is modified in the point...
Jake Hawkes about 1 year ago in Enterprise SCADA Server 1 Will not implement

Add support for partitioning on SQL2019SE and update guidance to use SQL2019 SE vs EE

This enhancement would allow partitioning to be enabled when using Standard edition. Not all tables will need partitioning, so some way to be able to choose whether a table is partitioned or not will be required. There are customers that want part...
Jake Hawkes about 1 year ago in Enterprise SCADA Server 0 Reviewing

OADC should not impact any existing custom GPOs added since last time it ran

Big Picture User Experience OADC should not modify the existence, contents or link order of any custom GPO policy Detailed Description As a SCADA administrator/installer, I need OADC to not modify any existing GPOs that I have put into place after...
Jake Hawkes about 1 year ago in Enterprise SCADA Server / Administration / Installation 0 Reviewing

Combine Tag & FlexTag into a single tagging solution

We have two tagging features: legacy, and Flex Tag What are the differences? Do we need to keep both? I've heard from a few people that they are recommending to customers to not use FlexTag, and to go back to legacy tagging due to the various desc...
Jake Hawkes about 1 year ago in Enterprise SCADA Server / Control Room Management 0 Reviewing

Override baseline scripts with project versions

Detailed Description Following the paradigm of "no changes in the install root", there is currently no way to modify/override the baseline scripts that control important aspects of the system that customers and projects teams are required to modif...
Jake Hawkes over 1 year ago in Enterprise SCADA Server / Administration / Installation / Other API/SDK 0 Waiting for information

Enhance Archive & Cleanup to be multi-RT-single-HIS aware

Big Picture User Experience Archive and Cleanup do work against the server configured as the Secondary Computer for the Archive service, even if the Secondary Computer is Hot for the Archive service. Further, for Split Realtime systems, there need...
Jake Hawkes over 1 year ago in Enterprise SCADA Server 1 Future consideration

Y2K38 Preparedness + Millisecond time consistency

Big Picture User Experience The Year 2038 problem (also known as Y2038, or Y2K38, or the ‘Epochalypse’) is a time datatype bug involving the use a signed 32-bit integer to store of Unix time. The data type is only capable of representing integers ...

Unable to clear inhibit on NORMAL alarm on Alarm State Inhibit if maximum time is configured

From IMS# 2379766 "The alarm inhibit on NORMAL fails to be cleared if the "maximum time for inhibit" is configured. User would like to set the "maximum time for inhibit" while still being able to freely toggle inhibit on NORMAL Customer is on 7.6 ...
Jake Hawkes over 1 year ago in Enterprise SCADA Server 0 Future consideration