To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Plant SCADA

Showing 106

Add a user friendly name in the AEL for devices using RDS

When using Plant SCADA with RDS it is difficult to recognize which session is consuming which license in the AEL, this makes it hard to troubleshoot licensing problems. In other products the situation is even worse where no session informaiton is ...
Guest 2 days ago in Plant SCADA / Other 0 Submitted

Export of the alarm list at Runtime on SA Projects

The export of the alarm list is not present in projects created with the SA template (it was present in old SxW_Style projects). The implementation of an export command requires the inclusion of the Tab_Style_Include project and the use of compone...
Guest 11 days ago in Plant SCADA / Alarms 0 Submitted

The SA Treeview needs an option to hide the cluster node

One major use of clustering is for distributed processing on large sites. In this case it makes no sense for the cluster name to be part of the equipment tree as it may be arbitrarily assigned and named.
Guest 6 days ago in Plant SCADA / Equipment 0 Submitted

Cannot access AEL UI when customer SMS port is used

When installing AEL version 4.0.1 and activating secure mode, if a non-standard SMS port is used, the URL becomes unreachable. Although the manual provides steps to address this issue, it would significantly improve user experience if this configu...
Peter Chung 7 days ago in Plant SCADA / Other 0 Submitted

Remove more than 1 version in the deployment server at a time

It would be highly beneficial to introduce the capability to remove multiple versions simultaneously. Additionally, an automated feature to retain only the latest 10 versions.
Peter Chung 6 months ago in Plant SCADA / Other 0

Enhance the OPC UA server browsing feature in AVEVA Plant SCADA to allow batch selection and import of multiple tags simultaneously, improving efficiency for users handling large tag sets

The current OPC UA server browsing feature in AVEVA Plant SCADA only allows users to browse and import tags one by one. This process is not feasible when dealing with large systems containing thousands of tags, as it significantly increases the ti...
Guest 2 months ago in Plant SCADA / Drivers / Protocols 0 In Roadmap

Remove the Need for pg* Files

Eliminate the requirement for pg*.dbf files. These files are not really needed as the same info is in the .ctg files. These files make it difficult to use PlantSCADA with version control, such as SVN or git since either these files need to be vers...
Guest over 2 years ago in Plant SCADA / Graphics / Visualization 1

The SA include treeview control does not have the ability to change the order of the elements in a leaf.

It would be useful to change the order so that the tree can reflect the logical order of the process plant however that looks, for example the flow of material or process vs ancillary equipment or whatever rather than just alphabetically.
Guest about 2 months ago in Plant SCADA / Equipment 0

OPCUA Variable Import limited to 79 characters

When you import Variable Tags from an OPCUA Server the tag names are truncated to 79 characters, this is sometime not enough. Duplicate tagnames are not allowed. You have to manually adjust all the names. For instance when you connect to a Plant S...
Guest about 1 year ago in Plant SCADA / Drivers / Protocols 1

Unify automatic generation of Configuration Parameters in Plant SCADA Studio 2023 and Equipment Editor

Currently when adding new Equipment through Equipment Editor, all relevant Configuration Parameters will be generated automatically and are available in Plant SCADA Studio 2023. However if you add a new Equipment in Plant SCADA Studio and run "Upd...
Guest almost 2 years ago in Plant SCADA / Equipment 1