Skip to Main Content
AVEVA™ Products Feedback Portal

Welcome to our new feedback site!


We created this site to hear your enhancement ideas, suggestions and feedback about AVEVA products and services. All of the feedback you share here is monitored and reviewed by the AVEVA product managers.

To start, select the product of your interest in the left column. Then take a look at the ideas in the list below and VOTE for your favorite ideas submitted by other users. POST your own idea if it hasn’t been suggested yet. Include COMMENTS and share relevant business case details that will help our product team get more information on the suggestion. Please note that your ideas will first be moderated before they are made visible to other users of this portal.

This page is for feedback for specific AVEVA solutions, excluding PI Systems and Data Hub. For links to these other feedback portals, please see the tab RESOURCES below.

ADD A NEW IDEA

Clear

Enterprise SCADA Server

Showing 116 of 775

Ability to change MOC package name & description

Big Picture User Experience As an MOC user that is promoting packages, I need a way to change the title and description of a package after it has been created. I need this because ..... typos? change in how the package is to be promoted/tested/use...
Jake Hawkes 10 months ago in Enterprise SCADA Server 0 Future consideration

Device Based History to support additional Data Types

Big Picture User Experience Enhance Device Based History to support common device based data types such as 32 bit integers and double types. Device Based History is what we call the ability to upload data from a device in bulk, such as historical ...
Vitali Unke 10 months ago in Enterprise SCADA Server 0 Reviewing

MOC Package Promotion Can be Forced to Override Old Value Check

Big Picture User Experience As an MoC administrator who is promoting a package between zones, I need the option to disable the old value check before promoting, or override the check should a mismatch be detected. I need this because there are man...
Vitali Unke 11 months ago in Enterprise SCADA Server 0 Reviewing

Control room workstations on separate subnet architecture

Operators often want to deploy their control room clients on a separate subnet. For example, in deployments where workstations are in a separate physical location. SERPM-296 (http://tcjira.schneider-electric.com/browse/SERPM-296)
Jake Hawkes 12 months ago in Enterprise SCADA Server 0 Reviewing

Software accumulator to have configureable rollover limit

When rate point is configured as a pulse input type its accumulating the flow with pulses. Based on number of pulses per fixed time, the system calculates the actual flow rate. With Hardware accumulator, the system depends on the field device to p...
Vitali Unke about 1 year ago in Enterprise SCADA Server 1 Reviewing

Support for Win 11 and Server 2025 LTSC versions

Big Picture User Experience Next release of Enterprise SCADA to support of the next MSFT stack of new Operating systems. Detailed Description Windows 11 LTSC and Windows Server 2025 are due to be released before Dec 31 2024. We must support these...
Vitali Unke about 1 year ago in Enterprise SCADA Server 0 Reviewing

Enhance ACE to be triggered by timestamp for any record in Realtime

IMS# 1766330 Customer was using inchtime.high to trigger an ACE routine from an RtString record. A defect was fixed that stopped the timestamps being published via PubSub, which caused ACE to stop triggering. The proposed fix is to allow ACE to be...
Jake Hawkes over 1 year ago in Enterprise SCADA Server 0

[OADC] Support AD-Tiering and VM Hosts

Big Picture User Experience Enhance the OADC tool to support AD-Tiering when installing and upgrading Enterprise SCADA Use Cases The product should install into an AD structure that complies with the intention of AD-tiering, which has since evolve...
Jake Hawkes over 1 year ago in Enterprise SCADA Server 0 Reviewing

Add alarm delay for digital points

Big Picture User Experience Add On/Off alarm delay for digital points (status and multistate) in the same fashion as for analog. Detailed Description The product currently enables the configuration of analog points to delay alarm generation and su...
Jake Hawkes over 1 year ago in Enterprise SCADA Server 0 Reviewing

Reaching dataset limit prevents system to operate without any user feedback that the limit has been reached

This feature is to address and issue where customer has reached maximum number of datasets allowed (currently it is around 25 I believe - increased from 10 to satisfy some short term requirements). This feature is added to address comment from PMF...
Jake Hawkes over 1 year ago in Enterprise SCADA Server 0